The Confederated Tribes of the Warm Springs (CTWS), in partnership with the Hood River Watershed Group (HRWG) and private landowners, is proposing to advance the design and conduct associated surveys for the Lower East Fork Hood River Phase III Instream Habitat Enhancement project. The project reach extends from the Mt. Hood Highway Bridge (upstream) to the Woodworth Drive Bridge (downstream), approximately 0.5 miles west of Mount Hood, Oregon. The East Fork Hood River supports ESA-listed threatened winter steelhead (Middle Columbia River ESU), Coho Salmon (Lower Columbia River ESU), and spring Chinook Salmon (Middle Columbia River spring-run ESU). A 30 Percent Basis of Design Report was completed in June 2025. 55 large wood structures, selective floodplain grading, and riparian revegetation were selected as the primary restoration elements.
PCSRF funds will be used entirely for subcontracts to advance the design from 30 percent to 90 percent, development of final construction documents and to conduct associated geotechnical, morphological, and/or wetland surveys required for final design and regulatory permitting. These deliverables are necessary prerequisites for construction funding and implementation. Separate funds will be used to achieve habitat restoration, including channel reconfiguration and connectivity, and channel structure placement.
Project Benefit
The completed design and surveys will directly enable construction of 55 large wood structures and 43 pools, and selective floodplain grading on the Lower East Fork Hood River. The proposed construction project is expected to increase off-channel habitat from 0 to 3.5 acres at the 95 percent exceedance flow, from 0.8 to 6.1 acres at a typical winter flow (400 cfs), and from 3.3 to 10.5 acres at the 5 percent exceedance flow. Main channel shear stress will be reduced 12–15 percent at the 2- and 10-year floods, promoting gravel retention and improved spawning conditions for target species. Native riparian revegetation will stabilize disturbed banks and provide shade. These improvements will increase juvenile rearing and adult holding/spawning habitat for ESA-listed winter steelhead, Coho Salmon, and spring Chinook Salmon in a reach where pool frequency, pool area, and large wood density have been documented below target thresholds.
Accomplishments
| Instream Habitat |
| Stream Miles Treated |
|
.90 |
Funding Details |
| PCSRF | $216,717 |
| Other | $235,074 |
| Report Total: | $451,791 |
|
| |
Worksites
Lower East Fork Hood River Phase 3
- Worksite Identifier: Lower East Fork Hood River Phase 3
- Start Date: 07/01/2026
- End Date: 06/30/2027
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Middle Columbia (170701)
- Subbasin: Middle Columbia-Hood (17070105)
- Watershed: East Fork Hood River (1707010505)
- Subwatershed: Lower East Fork Hood River (170701050506)
- State: Oregon
- Recovery Domain: Lower Columbia River
- Latitude: 45.537678
- Longitude: -121.581209
ESU
- Lower Columbia River Coho Salmon ESU
- Mid-Columbia River Spring-run Chinook Salmon ESU
- Middle Columbia River Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding .00
- . . C.0.b
Length of stream treated/protected
- . . C.0.c
| Project identified in a Plan or Watershed Assessment | |
|
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding
- . . . . C.4.b
Total length of instream habitat treated
- . . . . C.4.c.1
Channel reconfiguration and connectivityY (Y/N)
- . . . . . . C.4.c.2
Type of change to channel configuration and connectivity (LOV)
- . . . . . . C.4.c.3
Miles of stream treated for channel reconfiguration and connectivity
- . . . . . . C.4.c.4
Miles of off-channel stream created through channel reconfiguration and connectivity
- . . . . . . C.4.c.5
Acres of off-channel or floodplain connected through channel reconfiguration and connectivity
- . . . . . . C.4.c.6
Instream pools created/added through channel reconfiguration and connectivity
- . . . . C.4.d.1
Channel structure placementY (Y/N)
- . . . . . . C.4.d.2
Material used for channel structure (LOV)
- . . . . . . C.4.d.3
Miles of stream treated through channel structure placement
- . . . . . . C.4.d.4
Acres of streambed treated through channel structure placement
- . . . . . . C.4.d.5
Pools expected to be created through channel structure placement
- . . . . . . C.4.d.6
Yards of average stream-width at mid-point of channel structure placement project (Yards)
- . . . . . . C.4.d.7
Number of structures placed in channel
|
|