Description    


The CTWSRO has implemented numerous restoration projects within the Middle Fork John Day River Intensively Monitored Watershed (MFIMW) alongside multiple partnering agencies. Current monitoring strategies have not detected changes in stream temperatures at the basin wide scale post-restoration. The MFIMW Monitoring Report identified elevated stream temperature as the primary freshwater limiting factor to salmonid productivity, specifically Spring Chinook salmon and summer steelhead. The report also identified a lack of spatially relevant stream temperature data to quantify the impacts of restoration on stream temperatures. CTWSRO plans to target this knowledge gap by increasing and diversifying monitoring efforts beginning in 2026 to better detect impacts of restoration on restored stream reaches. To accomplish this, temperature arrays and hyporheic flow monitoring devices will be purchased with non-PCSRF funding by our watershed partners and installed within a series of restored and unrestored stream reaches. This study design will allow for comparisons of water temperature changes within and between these restored sites. The nature of the MFIMW is that it is a collaborative effort of many partnering organizations including CTWSRO, ODFW, CRITFC, the NF John Day Watershed Council, and the USFS. Therefore, this work is supported broadly by partnering agencies also invested in stream temperature monitoring. However, these monitoring efforts require additional PCSRF funding to support specialized water temperature mapping and data analysis over a multiple year period to gain a mechanistic understanding of the system. All funds associated with this proposal will be delivered to the University of Idaho via subcontract for field work implementation.



Many of the monitoring location identified in this proposal have previous received restorative treatment, and proposed monitoring will evaluate site-specific responses in context of those actions.



Worksite #1:

We will spatially map water temperature in the channel during the critical summer low-flow period using mobile temperature units. Additionally, we will deploy a comprehensive array of temperature and hyporheic flux sensors within the fluvial corridor of the MF John Day River to capture time series data and identify diel temperature changes at both the scale of individual morphologic features and across entire reaches. Depending on the observed temperature and morphologic conditions in each restored reach, we will install up to 37 hyporheic flux sensors at strategic locations along the streambed to quantify the direction, magnitude, and temperature of post-restoration hyporheic fluxes. These will be confirmed by periodic discharge surveys throughout the summer that evaluate seepage gains and losses over the extent of each restoration reach. Additionally, we will use up to 31 Paco stakes (short two sensor hyporheic flux stakes) to continuously monitor diel water temperatures and shallow hyporheic fluxes around features of interest in the main channel, incoming tributaries where hyporheic influx is present, as well as immediately upstream and downstream of thermally stratified pools. Select stratified pools will be continuously monitored using up to 10 vertical temperature arrays to determine the magnitude, duration, and rate of thermal change in the stratification dynamics. This suite of measurements will be deployed to complement the existing temperature sensors along the river and tributaries maintained by the MFIMW Water Temperature Monitoring Subgroup and provided by the NFJDWC. Further, a series of existing groundwater monitoring stations and up to 21 piezometers in the floodplain will provide groundwater temperature and elevations.



This is a proposed 5-year monitoring project (2025-2030) to provide sufficient time to collect field data, troubleshoot problems, and analyze results over multiple years.

Project Benefit    


Stream temperatures in the MFJDR are increasingly limiting the habitat availability, survival, and persistence of Spring Chinook salmon (Oncorhynchus tschawytscha) and summer steelhead (O. mykiss). Restoration efforts have been underway since 2011 to increase habitat area for these target species, but there has been no comprehensive assessment of the specific thermal impacts resulting from different restoration strategies. Given the physiological stress that elevated water temperatures place on native fish, particularly in meadow systems like those in the MFJDR, there is an urgent need to identify which restoration actions most effectively enhance water temperature heterogeneity and thermal buffering capacity in order to limit thermal stress on native aquatic species.



This project will provide valuable insights into the thermal improvement potential of restoration actions by utilizing advanced temperature and hyporheic measurement

techniques to mechanistically compare the impacts of various restoration strategies across multiple reaches of the upper MFJDR. This information is needed to advise adaptive management strategies, optimize future restoration projects, and ensure that investments in habitat restoration lead to measurable improvements in salmonid resilience to thermal stress.

Accomplishments

Metric Completed Originally
Proposed
Research and Monitoring
  Stream Miles Monitored 10.00

Funding Details

SourceFunds
State$291,476
Report Total:$291,476


Project Map



Worksites

Middle Fork John Day River – Bridge Creek to Beaver Creek    


  • Worksite Identifier: Middle Fork John Day River – Bridge Creek to Beaver Creek
  • Start Date: 05/01/2026
  • End Date: 06/30/2030
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: John Day (170702)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Oregon
  • Recovery Domain: Middle Columbia River
  • Latitude: 44.59469
  • Longitude: -118.51733

ESU

  • Mid-Columbia River Spring-run Chinook Salmon ESU
  • Middle Columbia River Steelhead DPS

Map

Photos

Metrics

Metrics
  • E.0 Salmonid Research, Monitoring, and Evaluation (RM&E)Y (Y/N)
    •      . . E.0.a RM&E Funding .00
    •      . . E.0.b
      Complement habitat restoration project
    •      . . E.0.c
      Project identified in a plan or watershed assessment.
    •      . . E.0.d.1 Number of Cooperating Organizations
    •      . . E.0.d.2
      Name Of Cooperating Organizations.
    •      . . E.0.e.1 Number of reports prepared
    •      . . E.0.e.2
      Name Of Report
    •      . . E.1 MonitoringY (Y/N)
      •      . . . . E.1.a Monitoring funding
      •      . . . . E.1.b.1 Stream Miles Monitored
      •      . . . . E.1.b.2 Acres of Watershed Area Monitored
      •      . . . . E.1.b.3 Square miles of water monitored (Square miles)
      •      . . . . E.1.c.8 Water quality monitoringY (Y/N)
        •      . . . . . . E.1.c.8.a # miles (to nearest 0.01 mile) of stream monitored for water quality
      •      . . . . E.1.c.9 Water quantity (flow) monitoringY (Y/N)
        •      . . . . . . E.1.c.9.a # miles (to nearest 0.01 mile) monitored for water quantity (flow) monitoring
      •      . . . . E.1.c.13 Restoration effectiveness monitoringY (Y/N)
        •      . . . . . . E.1.c.13.a # miles (to nearest 0.01 mile) of stream or streambank monitored
        •      . . . . E.1.d
          Name Of Comprehensive Monitoring Strategy/Program
        •      . . . . E.1.e
          Description of monitoring