Upper Mainstem John Day River Riparian Protection and Enhancement
Salmonid Habitat Restoration and Acquisition
|
| 25-Warm-03 | | Middle Columbia River | | 08/01/2026 | | 12/31/2028 | | 2025 | | Ongoing | | 09/23/2026 | | |
| |
Description
This project delivers passive riparian restoration across multiple privately owned reaches of the Upper Mainstem John Day River (UJDR) and select tributaries. Actions focus on permanent livestock exclusion fencing, targeted riparian planting, and grazing management coordination to reduce solar loading, stabilize streambanks, and accelerate natural recovery of shade and large-wood recruitment. The UJDR supports Middle Columbia River spring-run Chinook salmonand steelhead, as well as bull trout and cutthroat trout; elevated summer temperatures and degraded riparian condition are key limiting factors. Work will be prioritized with ODA’s shade-gap model and implemented collaboratively with Grant SWCD, private landowners, and CTWS’ John Day Nursery Program. PCSRF funds support fencing materials acquisition and installation; partner funds support plant materials/installation, project management and coordination, and stewardship agreements. Funds associated with this proposal will be administered by Grant Soil and Water Conservation District via subcontract with CTWS.
Riparian buffer implementation will be guided by established regulatory and Tribal standards to ensure widths are sufficient to achieve stream temperature and habitat objectives. Where site-specific geomorphic or vegetation analyses are available, buffer widths will be prescribed based on those assessments. Where such analysis is not feasible at the project development stage, buffers will be implemented to meet or exceed existing standards.
Implementation will occur in coordination with Oregon Department of Agriculture (ODA) riparian protection standards. In areas where ODA prescriptions are not directly applicable or site-specific determinations are pending, the Confederated Tribes of Warm Springs’ Upper John Day standard riparian buffer width of 150 feet from the ordinary high water mark will be applied as a default minimum, with the caveat that this will not always be achievable on private land where land-use constraints may demand smaller buffer widths.
Worksite #1 Proposed Work: Upper Mainstem John Day River
Install approximately 10.00 miles of permanent riparian exclusion fence, establish ~25.0 acres of native riparian plantings (willow, cottonwood, alder, dogwood, sedge/rush assemblages), and implement livestock exclusion on ~60.6 acres of riparian corridor. Anticipated outcomes include increased effective shade, reduced bank erosion, cooler summer temperatures, and improved rearing/holding cover for juvenile salmonids. PCSRF ($200,000) will pay for fencing materials and installation. Non-PCSRF partner funds (Grant SWCD/ODA/BPA or other matches) will support additional fence segments, landowner agreements, plant installation.
While specific parcel-level project sites cannot be finalized at the time of proposal due to required landowner coordination and voluntary participation, partner organizations have identified priority target reaches based on cold-water inputs and temperature sensitivity. These include:
• Reynolds Creek
• Deardorff Creek
• Upper Mainstem John Day River priority reaches
Final project site selection will occur through landowner outreach and partner coordination processes that have demonstrated consistent success in prior basin restoration efforts.
Project Benefit
Riparian exclusion and planting will: (1) increase effective shade and reduce peak summer temperatures; (2) improve bank stability and overhead/edge cover; (3) enhance future large-wood recruitment; and (4) reduce fine-sediment inputs from trampling and sloughing. Collectively these actions expand suitable rearing/holding conditions and seasonal refugia, improving juvenile survival and growth. Benefits extend to bull trout and cutthroat where cold-water microhabitats and cover improve.
Accomplishments
| Riparian Habitat |
| Stream Miles Treated |
|
3.78 |
| Acres Treated |
|
27.6 |
Funding Details |
| Other | $250,000 |
| Report Total: | $250,000 |
|
| |
Worksites
Upper Mainstem John Day River
- Worksite Identifier: Upper Mainstem John Day River
- Start Date: 08/01/2026
- End Date: 12/31/2028
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: John Day (170702)
- Subbasin:
- Watershed:
- Subwatershed:
- State: Oregon
- Recovery Domain: Middle Columbia River
- Latitude: 44.387945
- Longitude: -118.580856
ESU
- Mid-Columbia River Spring-run Chinook Salmon ESU
- Middle Columbia River Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding .00
- . . C.0.b
Length of stream treated/protected
- . . C.0.c
| Project identified in a Plan or Watershed Assessment | |
|
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.5
Riparian Habitat ProjectY (Y/N)
- . . . . C.5.a
Riparian Habitat Funding
- . . . . C.5.b.1
Total riparian miles streambank treated
- . . . . C.5.b.2
Total Riparian Acres Treated
- . . . . C.5.c.1
Riparian plantingY (Y/N)
- . . . . . . C.5.c.2
| Species of plants planted in riparian | |
|
- . . . . . . C.5.c.3
Acres planted in riparian
- . . . . . . C.5.c.4
Miles of streambank treated with riparian planting
- . . . . C.5.d.1
FencingY (Y/N)
- . . . . . . C.5.d.2
Miles of fence along stream
- . . . . . . C.5.d.3
Acres of riparian area protected by fencing
|
|