Phipps Meadow Habitat Enhancement

Salmonid Habitat Restoration and Acquisition

Instream Habitat Riparian Habitat
Project ID25-Warm-02
Recovery DomainsMiddle Columbia River
Start Date04/01/2027
End Date12/31/2027
Year2025
StatusNew
Last Edited09/23/2026
 
1 - 1

Description    


The Phipps Meadow Habitat Enhancement Project will restore hydrologic and geomorphic function across approximately 1.00 mile of the Middle Fork John Day River and 35.0 acres of floodplain and wet meadow habitat located three miles upstream of Austin, Oregon. The project is a partnership between the Confederated Tribes of Warm Springs (CTWS), Blue Mountain Land Trust (BMLT), U.S. Forest Service (USFS), and the U.S. Bureau of Reclamation (USBR). Restoration will address primary limiting factors identified for Middle Fork Chinook and steelhead habitat including channel incision, floodplain disconnection, elevated summer temperatures, and lack of complex instream structure.

Designs developed by Inter-Fluve (2024 Basis of Design Report) will be refined and permitted in 2026, with implementation in 2027. Primary construction activities include selective channel filling and narrowing, installation of large wood and beaver-dam analog (BDA) structures to increase channel roughness and promote floodplain activation, excavation of side channels and swales to enhance perennial rearing habitat, placement of gravel and wood within the valley bottom to encourage hydraulic diversity, and replacement of an undersized culvert with a bridge to improve fish passage. Riparian plantings and livestock exclusion fencing will support long-term stability and wood recruitment.



PCSRF funds ($300,000) will cover construction labor, materials, and vegetation establishment. All cost share for design and remaining implementation will be provided by BPA and USBR.



Pre-implementation monitoring datasets – including temperature, discharge, physical habitat, and riparian composition and structure – have been collected to inform design and establish quantified baseline conditions. A project-specific Monitoring and Adaptive Management Plan is being developed in tandem with designs to establish measurable objectives used to evaluate project success and identify adaptive management opportunities. Target objectives will be established through further design iterations and modeling results but will include metrics such as: floodplain inundation area as a function of discharge; length, area, and volume of off-channel habitat features; physical habitat characteristics including width:depth ratios, sinuosity ratio, large woody debris density, pool count and residual depth, riparian composition and structure, and groundwater elevation. This list is not inclusive and will be finalized in unison with the design process. Monitoring data will be collected immediately following construction and at future intervals.



30% of designs are completed, with remaining design iterations to be delivered as follows:

• 4/1/26 – 80% Designs, BDR, hydraulic modeling results, specifications, and cost estimate

• 9/1/26 – 100% Designs, BDR, and implementation plan

• 7/15/27 through 8/1



Worksite #1 Proposed Work: Phipps Meadow



Restoration actions within the Phipps Meadow reach will reconnect the Middle Fork John Day River to its historic floodplain and enhance channel complexity across the 1-mile project area. Construction will include installation of large-wood and beaver-dam analog structures to increase roughness and raise water-surface elevations, selective channel filling and narrowing to reverse incision, and excavation of side channels and swales to restore perennial off-channel rearing habitat. Relic beaver-dam analogs will be used as grade controls to stabilize bed elevations and encourage frequent overbank inundation. Floodplain wood placements and “flood-fence” structures will help spread flows laterally and reduce erosive energy. Riparian areas will be revegetated with native graminoids, willow, and sedge species to increase shade and future wood recruitment, with fencing to exclude livestock until vegetation is established.

Project Benefit    


The project will enhance critical spawning and rearing habitat for Middle Columbia River spring-run Chinook salmon and summer steelhead. By raising the water table and increasing ground-water exchange, the project will moderate summer water temperatures and extend flow duration during dry months. Re-established side channels and beaver-like structures will create slow-water rearing habitat and provide refugia from high flow events. Riparian revegetation will supply shade and future large wood recruitment, further stabilizing the channel and enhancing cover for juvenile fish. Over time, the restored meadow will support a resilient complex of instream and off-channel habitats that improve survival and growth of both species throughout their freshwater life stages.

Accomplishments

Metric Completed Originally
Proposed
Instream Habitat
  Stream Miles Treated 1.00
Riparian Habitat
  Stream Miles Treated 2.00
  Acres Treated 20.5

Funding Details

SourceFunds
Other$750,000
Report Total:$750,000


Project Map



Worksites

Phipps Meadow    


  • Worksite Identifier: Phipps Meadow
  • Start Date: 04/01/2027
  • End Date: 12/31/2027
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: John Day (170702)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Oregon
  • Recovery Domain: Middle Columbia River
  • Latitude: 44.586741
  • Longitude: -118.447096

ESU

  • Mid-Columbia River Spring-run Chinook Salmon ESU
  • Middle Columbia River Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding .00
    •      . . C.0.b Length of stream treated/protected
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding
      •      . . . . C.4.b Total length of instream habitat treated
      •      . . . . C.4.c.1 Channel reconfiguration and connectivityY (Y/N)
        •      . . . . . . C.4.c.2 Type of change to channel configuration and connectivity (LOV)
        •      . . . . . . C.4.c.3 Miles of stream treated for channel reconfiguration and connectivity
        •      . . . . . . C.4.c.4 Miles of off-channel stream created through channel reconfiguration and connectivity
        •      . . . . . . C.4.c.5 Acres of off-channel or floodplain connected through channel reconfiguration and connectivity
        •      . . . . . . C.4.c.6 Instream pools created/added through channel reconfiguration and connectivity
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement
        •      . . . . . . C.4.d.4 Acres of streambed treated through channel structure placement
        •      . . . . . . C.4.d.5 Pools expected to be created through channel structure placement
        •      . . . . . . C.4.d.6 Yards of average stream-width at mid-point of channel structure placement project (Yards)
        •      . . . . . . C.4.d.7 Number of structures placed in channel
      •      . . C.5 Riparian Habitat ProjectY (Y/N)
        •      . . . . C.5.a Riparian Habitat Funding
        •      . . . . C.5.b.1 Total riparian miles streambank treated
        •      . . . . C.5.b.2 Total Riparian Acres Treated
        •      . . . . C.5.c.1 Riparian plantingY (Y/N)
          •      . . . . . . C.5.c.2
            Species of plants planted in riparian
          •      . . . . . . C.5.c.3 Acres planted in riparian
          •      . . . . . . C.5.c.4 Miles of streambank treated with riparian planting
        •      . . . . C.5.d.1 FencingY (Y/N)
          •      . . . . . . C.5.d.2 Miles of fence along stream
          •      . . . . . . C.5.d.3 Acres of riparian area protected by fencing