Mainstem John Day Forrest Conservation Area Instream Habitat Restoration

Salmonid Habitat Restoration and Acquisition

Instream Habitat Riparian Habitat
Project ID25-Warm-01
Recovery DomainsMiddle Columbia River
Start Date04/01/2027
End Date12/31/2028
Year2025
StatusNew
Last Edited09/23/2026
 
1 - 1

Description    


The Mainstem John Day Forrest Conservation Area (MSFCA) Instream Habitat Restoration Project will restore approximately 0.97 miles of the Mainstem John Day River and 31.4 acres of adjacent floodplain and riparian habitat east of Prairie City, Oregon. The site is owned and managed by the Confederated Tribes of Warm Springs (CTWS). Restoration addresses primary limiting factors identified in the John Day Basin Partnership Strategic Action Plan and the ESA 15 % design: (1) degraded channel structure and complexity, (2) degraded floodplain connectivity and function, and (3) degraded riparian condition.



When CTWS acquired the Forrest Conservation Area in 2001, the reach was highly incised with simplified habitat and denuded riparian vegetation. Two decades of riparian recovery and grazing management now allow a moderate earthwork intervention to accelerate reconnection of the floodplain and restore multi-channel function.

Design and construction elements include side-channel and alcove excavation, strategic floodplain grading, large wood and beaver-dam-analog structures, and replacement of an undersized bridge to improve hydrologic function while maintaining access for property operations and maintenance. These actions will diversify hydraulics, enhance off-channel rearing habitat for spring Chinook and summer steelhead, increase resiliency to peak flows, and improve cold-water refugia.



Environmental Science Associates (ESA) is completing final design under CTWS direction in 2025–2026 with implementation scheduled for 2027–2028. All permitting will be conducted under BPA’s Habitat Improvement Program (HIP IV) and USACE RGP-6. PCSRF funds ($301,500) will support project construction; BPA will provide all remaining cost share for engineering, design, materials acquisition, and construction.



Pre-implementation monitoring datasets – including temperature, discharge, physical habitat, and riparian composition and structure – have been collected to inform design and establish quantified baseline conditions. A project-specific Monitoring and Adaptive Management Plan is being developed in tandem with designs to establish measurable objectives used to evaluate project success and identify adaptive management opportunities.



Approximately 15% of the designs are completed, with remaining design iterations to be delivered on the following timeline:

• 2/12/26 – 30% Designs, BDR, and hydraulic modeling results

• 10/26/26 – 80% Designs, BDR, construction specifications, and cost estimate

• 1/25/27 – 100% Designs, BDR, and implementation plan

• 7/15/27 through 8/15/27 – Implementation

• 9/1/27 and beyond – Monitoring and adaptive management



Worksite #1 Proposed Work: Mainstem Forrest Conservation Area



Construction will include the installation of wood structures, including engineered log jams and beaver dam analogs (BDAs), to increase channel roughness, promote overbank flooding, and enhance floodplain activation. New side channels will be excavated and existing flow paths enhanced to create and maintain perennial off-channel rearing habitat for juvenile salmonids. Selective grading will be performed throughout the valley bottom to increase hydraulic connectivity and encourage frequent inundation of the restored floodplain. In addition, constructed point bars and enhanced riffles using native materials will be installed to narrow the existing channel, elevate water surface profiles, and increase hydraulic diversity and sediment sorting. Riparian and floodplain areas will be revegetated with native species to promote long-term channel stability, shade, and wood recruitment.

Project Benefit    


Restoration will directly benefit Middle Columbia River spring-run Chinook and Middle Columbia River steelhead by increasing complex instream and off-channel habitat availability and improving connectivity between spawning and rearing areas. The actions will provide year-round access to off-channel refugia and reflood the historic floodplain to enhance juvenile growth and survival during summer low flows. Long-term benefits include self-maintaining channel and vegetation conditions that support sustained production of culturally important fish populations for the CTWS.

Accomplishments

Metric Completed Originally
Proposed
Instream Habitat
  Stream Miles Treated .97
Riparian Habitat
  Stream Miles Treated 1.94
  Acres Treated 5.3

Funding Details

SourceFunds
Other$500,000
Report Total:$500,000


Project Map



Worksites

Mainstem Forrest Conservation Area    


  • Worksite Identifier: Mainstem Forrest Conservation Area
  • Start Date: 04/01/2027
  • End Date: 12/31/2028
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: John Day (170702)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Oregon
  • Recovery Domain: Middle Columbia River
  • Latitude: 44.459336
  • Longitude: -118.69842

ESU

  • Middle Columbia River Steelhead DPS
  • Mid-Columbia River Spring-run Chinook Salmon ESU

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding .00
    •      . . C.0.b Length of stream treated/protected
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding
      •      . . . . C.4.b Total length of instream habitat treated
      •      . . . . C.4.c.1 Channel reconfiguration and connectivityY (Y/N)
        •      . . . . . . C.4.c.2 Type of change to channel configuration and connectivity (LOV)
        •      . . . . . . C.4.c.3 Miles of stream treated for channel reconfiguration and connectivity
        •      . . . . . . C.4.c.4 Miles of off-channel stream created through channel reconfiguration and connectivity
        •      . . . . . . C.4.c.5 Acres of off-channel or floodplain connected through channel reconfiguration and connectivity
        •      . . . . . . C.4.c.6 Instream pools created/added through channel reconfiguration and connectivity
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement
        •      . . . . . . C.4.d.5 Pools expected to be created through channel structure placement
        •      . . . . . . C.4.d.7 Number of structures placed in channel
      •      . . . . C.4.f.1 Spawning gravel placementY (Y/N)
        •      . . . . . . C.4.f.2 Miles of stream treated with addition of spawning gravel
        •      . . . . . . C.4.f.3 Cubic yards of spawning gravel placed (Cubic yards)
      •      . . C.5 Riparian Habitat ProjectY (Y/N)
        •      . . . . C.5.a Riparian Habitat Funding
        •      . . . . C.5.b.1 Total riparian miles streambank treated
        •      . . . . C.5.b.2 Total Riparian Acres Treated
        •      . . . . C.5.c.1 Riparian plantingY (Y/N)
          •      . . . . . . C.5.c.2
            Species of plants planted in riparian
          •      . . . . . . C.5.c.3 Acres planted in riparian
          •      . . . . . . C.5.c.4 Miles of streambank treated with riparian planting