Windler Floodplain Habitat Enhancement
Salmonid Habitat Restoration and Acquisition
|
| 1737561854348 | | - | | 03/28/2025 | | 02/29/2028 | | 2024 | | Ongoing | | 03/18/2026 | | |
| |
Description
The project will re-initiate geomorphic processes on the bar and create high quality winter rearing habitat and cold-water summer refugia for coho and other anadromous salmonids. The project design was funded by FRGP in 2019. 90% designs developed by MLA are consistent with the CA Restoration Manual. Project components include lowering the floodplain, side channel and alcove excavation, increasing side channel habitat complexity, and riverbar revegetation.
Project Benefit
The Windler Floodplain project will re-initiate fluvial geomorphic processes that promote scour and deposition, a complex channel network, bar top inundation, and groundwater recharge; create/enhance off-channel winter high-flow refugia for a broad range of flows, create/enhance in-river and off-channel cool water refugia; enhance low gradient spawning habitat; and restore riparian vegetation to provide shade and future large wood sources for natural recruitment.
Accomplishments
| Instream Habitat |
| Stream Miles Treated |
|
.61 |
| Riparian Habitat |
| Stream Miles Treated |
|
.61 |
| Acres Treated |
|
7.3 |
Funding Details |
| PCSRF | $1,888,038 |
| State | $2,000,022 |
| Other | $606,532 |
| In-Kind Donated Labor | $3,200 |
| Report Total: | $4,497,792 |
|
| |
Worksites
1737561854946
- Worksite Identifier: 1737561854946
- Start Date:
- End Date:
Area Description
Windler Bar, Gallia Pond and Cronan Gulch
Location Information
- Basin:
- Subbasin:
- Watershed:
- Subwatershed:
- State:
- Recovery Domain:
- Latitude: 41.31292
- Longitude: -123.19165
ESU
- Upper Klamath / Trinity Rivers Chinook Salmon ESU
- Southern Oregon/Northern California Coast Coho Salmon ESU
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding .00
- . . C.0.b
Length of stream treated/protected
- . . C.0.c
| Project identified in a Plan or Watershed Assessment | |
|
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding
- . . . . C.4.b
Total length of instream habitat treated
- . . . . C.4.d.1
Channel structure placementY (Y/N)
- . . . . . . C.4.d.4
Acres of streambed treated through channel structure placement
- . . . . . . C.4.d.5
Pools expected to be created through channel structure placement
- . . . . . . C.4.d.6
Yards of average stream-width at mid-point of channel structure placement project (Yards)
- . . C.5
Riparian Habitat ProjectY (Y/N)
- . . . . C.5.a
Riparian Habitat Funding
- . . . . C.5.b.1
Total riparian miles streambank treated
- . . . . C.5.b.2
Total Riparian Acres Treated
- . . . . C.5.c.1
Riparian plantingY (Y/N)
- . . . . . . C.5.c.2
| Species of plants planted in riparian | |
|
- . . . . . . C.5.c.3
Acres planted in riparian
|
|