North Fork Elk River Channel Instream Habitat and Upslope Restoration Project
Salmonid Habitat Restoration and Acquisition
|
| 1737561861038 | | - | | 04/07/2025 | | 03/01/2028 | | 2024 | | Ongoing | | 07/08/2026 | | |
| |
Description
The Project will construct 16 large wood (LW) structures within 1.8mi of North Fork (NF) Elk River and decommission 1.46mi of Elk River Mainline Road at 26 separate road treatment features (ditch relief culverts, culverts, road decommission segments, road upgrade segments, rolling dip), preventing 7,500 cubic yards of sediment from entering waterways. The riparian road runs parallel to the NF Elk River instream project reach. Work will include abandoning and rehabilitating 8 culverted crossings as well as several ditch relief culverts. Work will include a road-to-trail conversion by removing paved sections of the road, removing associated fill soils, outsloping, and revegetating with native plants.
Project Benefit
Implementation of project designs will directly benefit Coho Salmon by enhancing instream habitat and reducing sediment delivery to NF Elk River. Implementation of instream large wood is known to assist with sorting and storage of stream gravels, as well as pool formation associated with bed scour. Studies show that pool formation associated with large wood can increase the quality and quantity of instream habitats for salmonids, which has been positively linked to survival rates. Road decommissioning and the removal of culverted stream crossings will directly benefit Coho by improving hydrologic connection between upslope and instream salmonid habitat, filtering and reducing sediment before it enters the river.
Accomplishments
| Instream Habitat |
| Stream Miles Treated |
|
1.80 |
| Upland Habitat |
| Acres Treated |
|
3.8 |
Funding Details |
| PCSRF | $1,196,658 |
| In-Kind Other | $334,310 |
| Report Total: | $1,530,968 |
|
| |
Worksites
1737561861624
- Worksite Identifier: 1737561861624
- Start Date:
- End Date:
Area Description
NF Elk River
Location Information
- Basin: Northern California Coastal (180101)
- Subbasin:
- Watershed:
- Subwatershed:
- State:
- Recovery Domain:
- Latitude: 40.70065
- Longitude: -124.13749
ESU
- California Coastal Chinook Salmon ESU
- Southern Oregon/Northern California Coast Coho Salmon ESU
- Northern California Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding .00
- . . C.0.b
Length of stream treated/protected
- . . C.0.c
| Project identified in a Plan or Watershed Assessment | |
|
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding
- . . . . C.4.b
Total length of instream habitat treated
- . . . . C.4.d.1
Channel structure placementY (Y/N)
- . . . . . . C.4.d.2
Material used for channel structure (LOV)
- . . . . . . C.4.d.3
Miles of stream treated through channel structure placement
- . . . . . . C.4.d.4
Acres of streambed treated through channel structure placement
- . . . . . . C.4.d.7
Number of structures placed in channel
- . . C.6
Upland Habitat And Sediment ProjectY (Y/N)
- . . . . C.6.a
Upland Habitat / Sediment Funding
- . . . . C.6.b.1
Acres of upland habitat area treated
- . . . . C.6.b.2
Miles of road treated in upland area
- . . . . C.6.b.3
Cubic yards (to nearest yard) of sediment prevented from entering stream (Cubic yards)
- . . . . C.6.d.1
Road closure / abandonmentY (Y/N)
- . . . . . . C.6.d.2
Miles of road closed / abandoned
- . . . . . . C.6.d.3
Average width of road closed / abandoned (Yards)
- . . . . C.6.e.1
Erosion control structures installedY (Y/N)
- . . . . . . C.6.e.2
Acres treated with erosion control structures
- . . . . . . C.6.e.3
Erosion / sediment control installations
- . . . . C.6.k.1
Trail or campground improvementY (Y/N)
- . . . . . . C.6.k.2
Acres of trail or campground improvement
|
|