Huckleberry Creek Coho Refugia Project
Salmonid Habitat Restoration and Acquisition
|
| 1737561847731 | | - | | 03/19/2025 | | 02/28/2028 | | 2024 | | Ongoing | | 07/08/2026 | | |
| |
Description
This project will add 32 structures containing 95 pieces of large wood (LW) to Huckleberry Creek. Large wood structures will be installed along a 1.2-mile reach of Huckleberry Creek and will be composed of redwood and Douglas fir logs, whole trees, and logs with root wads, anchored to live trees along the stream banks. This project will provide habitat to coho salmon and steelhead, which have been documented in the project reach. Additionally, 200 redwoods and 50 native shrubs will be planted in the riparian zone along the project reach.
Project Benefit
The project will directly benefit salmonids by increasing pool area and depth, increasing shelter complexity, sorting substrate for spawning habitat, increasing the frequency of side channel and flood plain inundation, capturing large and small wood, and providing velocity refugia during high flows.
Accomplishments
| Instream Habitat |
| Stream Miles Treated |
|
1.16 |
| Riparian Habitat |
| Stream Miles Treated |
|
.50 |
| Acres Treated |
|
1.2 |
Funding Details |
| PCSRF | $194,030 |
| In-Kind Donated Labor | $26,936 |
| In-Kind Other | $47,500 |
| Report Total: | $268,466 |
|
| |
Worksites
1737561848293
- Worksite Identifier: 1737561848293
- Start Date:
- End Date:
Area Description
Huckleberry Creek Project Reach
Location Information
- Basin: Northern California Coastal (180101)
- Subbasin:
- Watershed:
- Subwatershed:
- State:
- Recovery Domain:
- Latitude: 39.73351
- Longitude: -123.72368
ESU
- Northern California Steelhead DPS
- Southern Oregon/Northern California Coast Coho Salmon ESU
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding .00
- . . C.0.b
Length of stream treated/protected
- . . C.0.c
| Project identified in a Plan or Watershed Assessment | |
|
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding
- . . . . C.4.b
Total length of instream habitat treated
- . . . . C.4.d.1
Channel structure placementY (Y/N)
- . . . . . . C.4.d.2
Material used for channel structure (LOV)
- . . . . . . C.4.d.3
Miles of stream treated through channel structure placement
- . . . . . . C.4.d.4
Acres of streambed treated through channel structure placement
- . . . . . . C.4.d.6
Yards of average stream-width at mid-point of channel structure placement project (Yards)
- . . . . . . C.4.d.7
Number of structures placed in channel
- . . C.5
Riparian Habitat ProjectY (Y/N)
- . . . . C.5.a
Riparian Habitat Funding
- . . . . C.5.b.1
Total riparian miles streambank treated
- . . . . C.5.b.2
Total Riparian Acres Treated
- . . . . C.5.c.1
Riparian plantingY (Y/N)
- . . . . . . C.5.c.2
| Species of plants planted in riparian | |
|
|
|