Big Meadow Creek Conceptual Design
Salmonid Restoration Planning and Assessments
|
| 017 24 CW | | Snake River | | 12/13/2024 | | 10/31/2026 | | 2024 | | Ongoing | | 10/23/2025 | | |
| |
Description
The Idaho Department of Fish and Game (IDFG) will develop a conceptual restoration design plan for 3.5 miles of Big Meadow Creek (BMC), a tributary of the West Fork Little Bear Creek (WFLBC) in the Potlatch River watershed. The development of this design plan will utilize currently available data, and additional data collection as needed. The final product will be a conceptual engineering design plan for this entire stream reach, which will be used by IDFG and restoration partners to guide restoration activities in Big Meadow Creek.
Project Benefit
The conceptual engineering design plans produced by this project will help guide IDFG and other restoration partners in the development of current, upcoming, and potential future projects in this drainage. Tackling this larger reach with a single conceptual design will
ensure that individual projects meet the restoration objectives for the drainage, that projects can be implemented independently without concerns about adjacent projects not fitting together, and help avoid the potential of redoing previous work to make a new project
successful. This will improve efficiency of project implementation, and result in direct cost savings. Of the 12 landowners on Big Meadow Creek within this project area, four are on board for restoration projects, six have expressed interest in talking further, and two have declined to partner on restoration projects.
Funding Details |
| PCSRF | $41,539 |
| Other | $13,846 |
| Report Total: | $55,385 |
|
| |
Worksites
WS-1
- Worksite Identifier: WS-1
- Start Date: 12/15/2024
- End Date: 10/31/2025
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Clearwater (170603)
- Subbasin: Clearwater (17060306)
- Watershed: Big Bear Creek (1706030610)
- Subwatershed: Little Bear Creek (170603061002)
- State: Idaho
- Recovery Domain: Snake River
- Latitude: 46.7686
- Longitude: -116.78355
ESU
- Snake River Basin Steelhead DPS
Map
Photos
Metrics
Metrics
- B.0
Salmonid Restoration Planning and AssessmentsY (Y/N)
- . . B.0.a
Planning And Assessment Funding .00
- . . B.0.b.1
Area Encompassed
- . . B.0.b.2
Stream Miles Affected
- . . B.1
Restoration Planning And CoordinationY (Y/N)
- . . . . B.1.a
Planning and Coordination funding
- . . . . B.1.b.11
Engineering/design work for restoration projectsY (Y/N)
- . . . . . . B.1.b.11.a
- . . . . . . B.1.b.11.b
| Description and scope of the plan implemented | |
|
|
|