Cop 3 and Sher 3 Fish Passage on the Copper River Delta

Salmonid Habitat Restoration and Acquisition

Fish Passage Improvement
Project IDAK570xx_placeholder5
Recovery Domains -
Start Date03/01/2025
End Date11/30/2027
Year2023
StatusNew
Last Edited01/14/2025
 
1 - 1

Description    


The Copper River Watershed Project (CRWP) and partners will restore fish passage and stream function at one Copper River Highway (Cop) and one Sheridan Glacier Road (Sher) stream crossing site on the Copper River Delta. Historical land use and alteration—railroad and highway construction—prevent migrating adult and juvenile coho salmon from reaching upstream spawning and rearing habitats, have degraded local stream conditions, and cause regular flooding of the roads at these sites. Through the installation of properly sized culverts and functional stream restoration, this partnership will restore access to 1.4 km and 3.8 hectares of pond of pristine upstream salmon spawning and rearing habitat, preserving these culturally and economically significant runs into the future.

Project Benefit    


This project will reestablish connectivity to 1.4 km of stream habitat and 3.8 hectares of pond habitat for spawning and rearing coho salmon. Stream simulation fish passage guidelines ensure that construction activities not only restore up and downstream connectivity for migrating fish, but eliminate road flooding and restore stream functions such as floodplain connectivity and sediment transport.

Accomplishments

Metric Completed Originally
Proposed
Fish Passage
  Barriers Removed
  Miles Opened 1.27

Funding Details

SourceFunds
PCSRF$14,685
Other$889,135
Report Total:$903,820


Project Map



Worksites

Sher 3    


  • Worksite Identifier: Sher 3
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Copper River (190201)
  • Subbasin: Lower Copper River (19020104)
  • Watershed: Sheridan River (1902010415)
  • Subwatershed: Glacier River-Sheridan River (190201041503)
  • State: Alaska
  • Recovery Domain:
  • Latitude: 60.484422
  • Longitude: -145.432491

ESU

  • Un-Named ESU Coho

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding .00
    •      . . C.0.b Length of stream treated/protected
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.2 Fish Passage ImprovementY (Y/N)
      •      . . . . C.2.a Fish Passage Funding
      •      . . . . C.2.b.1 Length of stream made accessible
      •      . . . . C.2.b.3 Type of blockage/barrier (LOV)
      •      . . . . C.2.b.4 Number of blockages/impediments/barriers impeding passage
      •      . . . . C.2.f.1 Culvert installed or improved at road stream crossingY (Y/N)
        •      . . . . . . C.2.f.2 Number of culverts installed or improved
        •      . . . . . . C.2.f.3 Miles of stream made accessible by culvert installation/upgrade

Cop 1    


  • Worksite Identifier: Cop 1
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Copper River (190201)
  • Subbasin: Lower Copper River (19020104)
  • Watershed: Sheridan River (1902010415)
  • Subwatershed: Glacier River-Sheridan River (190201041503)
  • State: Alaska
  • Recovery Domain:
  • Latitude: 60.48425
  • Longitude: -145.43221

ESU

  • Un-Named ESU Coho

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding .00
    •      . . C.0.b Length of stream treated/protected
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.2 Fish Passage ImprovementY (Y/N)
      •      . . . . C.2.a Fish Passage Funding
      •      . . . . C.2.b.1 Length of stream made accessible
      •      . . . . C.2.b.2 Square miles of streambed made accessible (Square miles)
      •      . . . . C.2.b.3 Type of blockage/barrier (LOV)
      •      . . . . C.2.b.4 Number of blockages/impediments/barriers impeding passage
      •      . . . . C.2.f.1 Culvert installed or improved at road stream crossingY (Y/N)
        •      . . . . . . C.2.f.2 Number of culverts installed or improved
        •      . . . . . . C.2.f.3 Miles of stream made accessible by culvert installation/upgrade