ODFW Fish Screening & Passage Restoration Project - Upper Willamette 2013/15 Biennium
Salmonid Habitat Restoration and Acquisition
|
OWEB 214-905-16509 | Willamette River | 07/01/2013 | 12/01/2015 | 2014 | Completed | 04/28/2025 | |
| |
Description
This project reports fish screening and passage projects implemented in the Upper Willamette domain. These projects were cost-shared with PCSRF funds through a 2013-2015 Biennium OWEB/ODFW agreement. The ODFW Fish Screens and Passage Program cost share program: 1) assists water users to implement projects that protect fish from impacts associated with the diversion of water, and 2) assists fish passage barrier owners to address artificial obstructions toward an approved fish passage solution. The project was comprised of 13 worksites; actions included: a) improved fish screens at 12 worksites, 11 new screens were installed and 1 existing screen was replaced/modified; screening 16.7 cfs; and b) fish passage was improved at one worksite - a dam was removed, improving passage to 12 miles of stream. PCSRF FFY 2014 funds were expended on project costs incurred during the FFY 2014 contract award period. PCSRF FFY 2013 funds and ‘Other’ sources of funds were used to initiate the project. No funds for this project are reported as match to PCSRF funds
Project Benefit
Unscreened or poorly screened diversions create a direct take on fish migrating or rearing near the diversion intake. By installing or replacing poorly functioning screens this ODFW program prevents the loss of fish at unscreened or poorly functioning screes at diversions, directly increasing fish survival during the freshwater stage of their lifecycle. In addition, voluntary fish passage projects are implemented to address all types of artificial obstructions toward an approved fish passage solution.
Accomplishments
Fish Passage |
Barriers Removed |
1 |
1 |
Miles Opened |
12.00 |
12.00 |
Fish Screens |
Screens Installed |
11 |
11 |
Funding Details |
PCSRF | $291,933 |
Other | $54,972 |
Report Total: | $346,905 |
|
| |
Worksites
20150479
- Worksite Identifier: 20150479
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Willamette (170900)
- Subbasin: North Santiam (17090005)
- Watershed:
- Subwatershed:
- State: Oregon
- Recovery Domain: Willamette River
- Latitude: 44.73104
- Longitude: -122.95461
ESU
- Upper Willamette River Steelhead DPS
- Upper Willamette River Chinook Salmon ESU
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 2,551.91
- . . C.0.b
Length of stream treated/protected .01
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
Upper Willamette River Conservation and Recovery Plan for Chinook Salmon and Steelhead, 2011 |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.1
Fish Screening ProjectY (Y/N)
- . . . . C.1.a
Fish screen funding 2,551.91
- . . . . C.1.c.1
Fish screens installedY (Y/N)
- . . . . . . C.1.c.2
Number of new fish screens installed 1
- . . . . . . C.1.c.3
Flow rate of screened water .55 (cfs)
20150487
- Worksite Identifier: 20150487
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Willamette (170900)
- Subbasin: Molalla-Pudding (17090009)
- Watershed:
- Subwatershed:
- State: Oregon
- Recovery Domain: Willamette River
- Latitude: 45.22421
- Longitude: -122.61891
ESU
- Upper Willamette River Chinook Salmon ESU
- Upper Willamette River Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 7,615.02
- . . C.0.b
Length of stream treated/protected .01
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
Upper Willamette River Conservation and Recovery Plan for Chinook Salmon and Steelhead, 2011 |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.1
Fish Screening ProjectY (Y/N)
- . . . . C.1.a
Fish screen funding 7,615.02
- . . . . C.1.c.1
Fish screens installedY (Y/N)
- . . . . . . C.1.c.2
Number of new fish screens installed 1
- . . . . . . C.1.c.3
Flow rate of screened water 1.67 (cfs)
20150488
- Worksite Identifier: 20150488
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Willamette (170900)
- Subbasin: Molalla-Pudding (17090009)
- Watershed:
- Subwatershed:
- State: Oregon
- Recovery Domain: Willamette River
- Latitude: 45.22087
- Longitude: -122.60943
ESU
- Upper Willamette River Chinook Salmon ESU
- Upper Willamette River Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 7,089.29
- . . C.0.b
Length of stream treated/protected .01
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
Upper Willamette River Conservation and Recovery Plan for Chinook Salmon and Steelhead, 2011 |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.1
Fish Screening ProjectY (Y/N)
- . . . . C.1.a
Fish screen funding 7,089.29
- . . . . C.1.c.1
Fish screens installedY (Y/N)
- . . . . . . C.1.c.2
Number of new fish screens installed 1
- . . . . . . C.1.c.3
Flow rate of screened water .99 (cfs)
20180019
- Worksite Identifier: 20180019
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Willamette (170900)
- Subbasin: North Santiam (17090005)
- Watershed:
- Subwatershed:
- State: Oregon
- Recovery Domain: Willamette River
- Latitude: 44.75468455
- Longitude: -122.41019571
ESU
- Upper Willamette River Steelhead DPS
- Upper Willamette River Chinook Salmon ESU
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 16,581.60
- . . C.0.b
Length of stream treated/protected .01
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
Upper Willamette River Conservation and Recovery Plan for Chinook Salmon and Steelhead, 2011 |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.1
Fish Screening ProjectY (Y/N)
- . . . . C.1.a
Fish screen funding 16,581.60
- . . . . C.1.c.1
Fish screens installedY (Y/N)
- . . . . . . C.1.c.2
Number of new fish screens installed 1
- . . . . . . C.1.c.3
Flow rate of screened water 1.7 (cfs)
20150482
- Worksite Identifier: 20150482
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Willamette (170900)
- Subbasin: Upper Willamette (17090003)
- Watershed:
- Subwatershed:
- State: Oregon
- Recovery Domain: Willamette River
- Latitude: 44.39226
- Longitude: -123.25848
ESU
- Upper Willamette River Chinook Salmon ESU
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 6,287.89
- . . C.0.b
Length of stream treated/protected .01
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
Upper Willamette River Conservation and Recovery Plan for Chinook Salmon and Steelhead, 2011 |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.1
Fish Screening ProjectY (Y/N)
- . . . . C.1.a
Fish screen funding 6,287.89
- . . . . C.1.c.1
Fish screens installedY (Y/N)
- . . . . . . C.1.c.2
Number of new fish screens installed 1
- . . . . . . C.1.c.3
Flow rate of screened water .66 (cfs)
20180005
- Worksite Identifier: 20180005
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Willamette (170900)
- Subbasin: Molalla-Pudding (17090009)
- Watershed:
- Subwatershed:
- State: Oregon
- Recovery Domain: Willamette River
- Latitude: 45.17027454
- Longitude: -122.48996562
ESU
- Upper Willamette River Chinook Salmon ESU
- Upper Willamette River Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 84,737.62
- . . C.0.b
Length of stream treated/protected .01
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
Upper Willamette River Conservation and Recovery Plan for Chinook Salmon and Steelhead, 2011 |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.2
Fish Passage ImprovementY (Y/N)
- . . . . C.2.a
Fish Passage Funding 84,737.62
- . . . . C.2.b.1
Length of stream made accessible 12.00
- . . . . C.2.b.3
Type of blockage/barrier (LOV)
- . . . . C.2.b.4
Number of blockages/impediments/barriers impeding passage 1
- . . . . C.2.c.1
Fish passage blockages removed or altered (other than road crossings reported in C.2.f to C.2.i)Y (Y/N)
- . . . . . . C.2.c.2
Number of blockages/impediments/barriers removed/altered 1
20150478
- Worksite Identifier: 20150478
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Willamette (170900)
- Subbasin: Molalla-Pudding (17090009)
- Watershed:
- Subwatershed:
- State: Oregon
- Recovery Domain: Willamette River
- Latitude: 45.05275
- Longitude: -122.68546
ESU
- Upper Willamette River Chinook Salmon ESU
- Upper Willamette River Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 4,250.08
- . . C.0.b
Length of stream treated/protected .01
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
Upper Willamette River Conservation and Recovery Plan for Chinook Salmon and Steelhead, 2011 |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.1
Fish Screening ProjectY (Y/N)
- . . . . C.1.a
Fish screen funding 4,250.08
- . . . . C.1.c.1
Fish screens installedY (Y/N)
- . . . . . . C.1.c.2
Number of new fish screens installed 1
- . . . . . . C.1.c.3
Flow rate of screened water .78 (cfs)
20150480
- Worksite Identifier: 20150480
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Willamette (170900)
- Subbasin: Middle Willamette (17090007)
- Watershed:
- Subwatershed:
- State: Oregon
- Recovery Domain: Willamette River
- Latitude: 45.27254
- Longitude: -122.95491
ESU
- Upper Willamette River Chinook Salmon ESU
- Upper Willamette River Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 4,838.63
- . . C.0.b
Length of stream treated/protected .01
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
Upper Willamette River Conservation and Recovery Plan for Chinook Salmon and Steelhead, 2011 |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.1
Fish Screening ProjectY (Y/N)
- . . . . C.1.a
Fish screen funding 4,838.63
- . . . . C.1.c.1
Fish screens installedY (Y/N)
- . . . . . . C.1.c.2
Number of new fish screens installed 1
- . . . . . . C.1.c.3
Flow rate of screened water 2.89 (cfs)
20150477
- Worksite Identifier: 20150477
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Willamette (170900)
- Subbasin: Tualatin (17090010)
- Watershed:
- Subwatershed:
- State: Oregon
- Recovery Domain: Willamette River
- Latitude: 45.67009
- Longitude: -123.06461
ESU
- Upper Willamette River Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 4,480.38
- . . C.0.b
Length of stream treated/protected .01
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
Upper Willamette River Conservation and Recovery Plan for Chinook Salmon and Steelhead, 2011 |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.1
Fish Screening ProjectY (Y/N)
- . . . . C.1.a
Fish screen funding 4,480.38
- . . . . C.1.c.1
Fish screens installedY (Y/N)
- . . . . . . C.1.c.2
Number of new fish screens installed 1
- . . . . . . C.1.c.3
Flow rate of screened water .29 (cfs)
20150489
- Worksite Identifier: 20150489
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Willamette (170900)
- Subbasin: Tualatin (17090010)
- Watershed:
- Subwatershed:
- State: Oregon
- Recovery Domain: Willamette River
- Latitude: 45.6711
- Longitude: -123.0645
ESU
- Upper Willamette River Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 6,187.86
- . . C.0.b
Length of stream treated/protected .01
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
Upper Willamette River Conservation and Recovery Plan for Chinook Salmon and Steelhead, 2011 |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.1
Fish Screening ProjectY (Y/N)
- . . . . C.1.a
Fish screen funding 6,187.86
- . . . . C.1.c.1
Fish screens installedY (Y/N)
- . . . . . . C.1.c.2
Number of new fish screens installed 1
- . . . . . . C.1.c.3
Flow rate of screened water .67 (cfs)
20180020
- Worksite Identifier: 20180020
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Willamette (170900)
- Subbasin: Middle Willamette (17090007)
- Watershed:
- Subwatershed:
- State: Oregon
- Recovery Domain: Willamette River
- Latitude: 44.81694459
- Longitude: -122.82262564
ESU
- Upper Willamette River Steelhead DPS
- Upper Willamette River Chinook Salmon ESU
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 193,182.19
- . . C.0.b
Length of stream treated/protected .01
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
Upper Willamette River Conservation and Recovery Plan for Chinook Salmon and Steelhead, 2011 |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.1
Fish Screening ProjectY (Y/N)
- . . . . C.1.a
Fish screen funding 193,182.19
- . . . . C.1.d.1
Fish screens replaced or modifiedY (Y/N)
- . . . . . . C.1.d.2
Number of fish screens replaced or modified 1
- . . . . . . C.1.d.3
Flow rate of screened water 5 (cfs)
20150476
- Worksite Identifier: 20150476
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Willamette (170900)
- Subbasin: Tualatin (17090010)
- Watershed:
- Subwatershed:
- State: Oregon
- Recovery Domain: Willamette River
- Latitude: 45.57129
- Longitude: -122.98971
ESU
- Upper Willamette River Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 3,338.19
- . . C.0.b
Length of stream treated/protected .01
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
Upper Willamette River Conservation and Recovery Plan for Chinook Salmon and Steelhead, 2011 |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.1
Fish Screening ProjectY (Y/N)
- . . . . C.1.a
Fish screen funding 3,338.19
- . . . . C.1.c.1
Fish screens installedY (Y/N)
- . . . . . . C.1.c.2
Number of new fish screens installed 1
- . . . . . . C.1.c.3
Flow rate of screened water .35 (cfs)
20150481
- Worksite Identifier: 20150481
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Willamette (170900)
- Subbasin: Upper Willamette (17090003)
- Watershed:
- Subwatershed:
- State: Oregon
- Recovery Domain: Willamette River
- Latitude: 44.39257
- Longitude: -123.25854
ESU
- Upper Willamette River Chinook Salmon ESU
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 5,764.48
- . . C.0.b
Length of stream treated/protected .01
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
Upper Willamette River Conservation and Recovery Plan for Chinook Salmon and Steelhead, 2011 |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.1
Fish Screening ProjectY (Y/N)
- . . . . C.1.a
Fish screen funding 5,764.48
- . . . . C.1.c.1
Fish screens installedY (Y/N)
- . . . . . . C.1.c.2
Number of new fish screens installed 1
- . . . . . . C.1.c.3
Flow rate of screened water 1.11 (cfs)
|
|