Bravo Offstream Watering

Salmonid Habitat Restoration and Acquisition

Upland Habitat And Sediment
Project IDOWEB 05-10-011-8756
Recovery DomainsN CA - S Oregon
Start Date03/10/2011
End Date04/17/2013
Year2009
StatusCompleted
Last Edited10/05/2026
 
1 - 1

Description    


This project added culverts at locations other than above stream crossings; developed an off-channel watering site.

Project Benefit    


The project will install 3 offstream watering systems and address 2 road sediment sites. The offstream watering systems will reduce livestock pressure on hillside pasture streams and riparian areas. This solution will reduce nutrient, bacteria, sediment, and solar radiation contributions to the waterways. Addressing the road sediment turbidity to downstream waterways. All of the project elements improve water quality for salmon spawning and rearing habitat downstream. The streams being addressed through the project flow into Hamilton Creek, then Jacks Creek, and on to the Chetco River- a significant salmon producing system.

Accomplishments

Metric Completed Originally
Proposed
Upland Habitat
  Acres Treated 1.8

Funding Details

SourceFunds
State$8,045
Other$1,789
In-Kind Donated Labor$2,424
Report Total:$12,258


Project Map



Worksites

20120692    


  • Worksite Identifier: 20120692
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Southern Oregon Coastal (171003)
  • Subbasin: Chetco (17100312)
  • Watershed:
  • Subwatershed:
  • State: Oregon
  • Recovery Domain: N CA - S Oregon
  • Latitude: 42.06470227
  • Longitude: -124.19089817

ESU

  • Southern Oregon/Northern California Coast Coho Salmon ESU
  • Southern Oregon / Northern California Coastal Chinook Salmon ESU
  • Oregon Coast Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 12,258.30
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Chetco River Watershed Assessment & Curry Action Plan/2002/South Coast WS Council
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
      •      . . . . C.6.a Upland Habitat / Sediment Funding 12,258.30
      •      . . . . C.6.b.1 Acres of upland habitat area treated 1.8
      •      . . . . C.6.b.2 Miles of road treated in upland area .15
      •      . . . . C.6.c.1 Road drainage system improvements and reconstructionY (Y/N)
        •      . . . . . . C.6.c.2 Miles of road treated for drainage system improvements and reconstruction .15
      •      . . . . C.6.j.1 Upland livestock management Y (Y/N)
        •      . . . . . . C.6.j.2 Upland livestock management action(s) taken (LOV)
        •      . . . . . . C.6.j.4 Number of livestock water installations/developments 3