East Fork Dam Habitat Restoration

Salmonid Habitat Restoration and Acquisition

Fish Passage Improvement Instream Habitat
Project IDOWEB 06-10-018-8308
Recovery DomainsN CA - S Oregon
Start Date06/07/2010
End Date07/23/2012
Year2009
StatusCompleted
Last Edited10/05/2026
 
1 - 1

Description    


This project Installed barrier bypass/fishway (other than fish ladder); placed instream anchored habitat structures; removed or modified diversion dam.

Project Benefit    


Fish passage will improve access to 2 miles of upstream areas as well as improve pool and gravel structure instream.

Accomplishments

Metric Completed Originally
Proposed
Instream Habitat
  Stream Miles Treated .25
Fish Passage
  Barriers Removed 1
  Miles Opened 4.00

Funding Details

SourceFunds
State$9,424
In-Kind Other$2,700
Report Total:$12,124


Project Map



Worksites

20120002    


  • Worksite Identifier: 20120002
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Southern Oregon Coastal (171003)
  • Subbasin: Applegate (17100309)
  • Watershed:
  • Subwatershed:
  • State: Oregon
  • Recovery Domain: N CA - S Oregon
  • Latitude: 42.15733152
  • Longitude: -123.25546744

ESU

  • Southern Oregon/Northern California Coast Coho Salmon ESU
  • Oregon Coast Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 12,124.04
    •      . . C.0.b Length of stream treated/protected .25
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Williams Creek Watershed Assessment 2000
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.2 Fish Passage ImprovementY (Y/N)
      •      . . . . C.2.a Fish Passage Funding 6,062.02
      •      . . . . C.2.b.1 Length of stream made accessible 4.00
      •      . . . . C.2.b.3 Type of blockage/barrier (LOV)
      •      . . . . C.2.b.4 Number of blockages/impediments/barriers impeding passage 1
      •      . . . . C.2.c.1 Fish passage blockages removed or altered (other than road crossings reported in C.2.f to C.2.i)Y (Y/N)
        •      . . . . . . C.2.c.2 Number of blockages/impediments/barriers removed/altered 1
      •      . . . . C.2.d.1 Fishway chutes or pools installedY (Y/N)
        •      . . . . . . C.2.d.2 Number of fishway chutes/pools installed 1
      •      . . C.4 Instream Habitat ProjectY (Y/N)
        •      . . . . C.4.a Instream Habitat Funding 6,062.02
        •      . . . . C.4.b Total length of instream habitat treated .25
        •      . . . . C.4.d.1 Channel structure placementY (Y/N)
          •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
          •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement .25
          •      . . . . . . C.4.d.5 Pools expected to be created through channel structure placement 6
          •      . . . . . . C.4.d.7 Number of structures placed in channel 6