Brandeau Powell Creek Restoration

Salmonid Habitat Restoration and Acquisition

Instream Habitat
Project IDOWEB 06-10-008-8109
Recovery DomainsN CA - S Oregon
Start Date04/14/2010
End Date01/24/2012
Year2009
StatusCompleted
Last Edited10/05/2026
 
1 - 1

Description    


This project placed large wood instream; stabilized a stream bank by installing log and rock revetment.

Project Benefit    


The goals are to reduce the bank erosion, install habitat logs, replant native vegetation, and enhance salmon spawning and rearing potential. The purpose to complete this project are to stop the lateral movement of the streambank toward the landowners house, slope the banks back, and plant erosion-resistant vegetation to maintain the site and provide shade.

Accomplishments

Metric Completed Originally
Proposed
Instream Habitat
  Stream Miles Treated .20

Funding Details

SourceFunds
State$9,839
Other$165
In-Kind Donated Labor$500
In-Kind Other$1,950
Report Total:$12,454


Project Map



Worksites

20110138    


  • Worksite Identifier: 20110138
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Southern Oregon Coastal (171003)
  • Subbasin: Applegate (17100309)
  • Watershed:
  • Subwatershed:
  • State: Oregon
  • Recovery Domain: N CA - S Oregon
  • Latitude: 42.26865785
  • Longitude: -123.27018223

ESU

  • Southern Oregon/Northern California Coast Coho Salmon ESU
  • Un-Named ESU Steelhead

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 12,454.19
    •      . . C.0.b Length of stream treated/protected .20
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Williams Creek Watershed Assessment/2000/WCWC
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 12,454.19
      •      . . . . C.4.b Total length of instream habitat treated .20
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement .20
        •      . . . . . . C.4.d.5 Pools expected to be created through channel structure placement 4
        •      . . . . . . C.4.d.7 Number of structures placed in channel 4
      •      . . . . C.4.e.1 Streambank stabilization Y (Y/N)
        •      . . . . . . C.4.e.2 Material Used For Streambank Stabilization (LOV)
        •      . . . . . . C.4.e.3 Miles of streambank stabilized .10