North Santiam Headwaters Spring Chinook Salmon Habitat Improvement
Salmonid Habitat Restoration and Acquisition
|
| OWEB 210-3048-7901 | | Willamette River | | 06/10/2010 | | 09/29/2014 | | 2009 | | Completed | | 06/24/2025 | | |
| |
Description
The purpose of this grant was to restore spawning habitat and to improve channel complexity and off-channel habitat for Upper Willamette River spring Chinook salmon both above and below Big Cliff and Detroit Dam. As part of the Hazards to Habitat Program the Oregon Department of Transportation and the US Forest Service removed approximately 85 hazard trees located along Highway 22. An additional 35 large trees were tipped and along with the highway trees placed in the main river channel, in side-channels and in the rivers floodplain. A total of 6 stream reaches were improved with multiple large wood structures: 3 reaches along the Upper North Santiam, 2 reaches on Horn Creek and 1 reach on Marion Creek. In addition to the large wood approximately 100 cubic yards of spawning gravel was added to 0.25 miles of Horn Creek. Six log sills were also strategically placed in Horn Creek to help hold the gravel in place. To improve fish habitat conditions below the dams the US Forest Service donated large wood swept from Detroit Lake to the watershed council. The large wood was incorporated into 4 council restoration projects on Snake Creek, Stout Creek, Cold Creek and Dieckman Creek.
Project Benefit
The goal and purpose of this project is to improve Upper Willamette River Chinook salmon habitat by restoring large wood in the mainstem North Santiam River and spawning habitat in Horn Creek. Partnering with the Oregon Department of Tansportation to reduce hazard trees adjacent to Highway 22 will also improve public safety. The From Hazards to Habitat portion of this project will also benefit Upper Willamette River winter steelhead as the North Santiam Watershed Council completes restoration projects the portion of the watershed below the Detroit and Big Cliff Dams.
Accomplishments
| Instream Habitat |
| Stream Miles Treated |
1.95 |
|
| Riparian Habitat |
| Stream Miles Treated |
.25 |
|
| Acres Treated |
1.0 |
|
Funding Details |
| State | $79,211 |
| In-Kind Donated Labor | $10,000 |
| In-Kind Other | $50,000 |
| Report Total: | $139,211 |
|
| |
Worksites
20140196
- Worksite Identifier: 20140196
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Willamette (170900)
- Subbasin: North Santiam (17090005)
- Watershed:
- Subwatershed:
- State: Oregon
- Recovery Domain: Willamette River
- Latitude: 44.53614317
- Longitude: -121.99738498
ESU
- Upper Willamette River Chinook Salmon ESU
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 31,554.71
- . . C.0.b
Length of stream treated/protected 1.00
- . . C.0.c
| Project identified in a Plan or Watershed Assessment | |
| OWEB Willamette Basin Restoration Priorities: North Santiam Watershed/2005/OWEB |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 31,554.71
- . . . . C.4.b
Total length of instream habitat treated 1.00
- . . . . C.4.d.1
Channel structure placementY (Y/N)
- . . . . . . C.4.d.2
Material used for channel structure (LOV)
- . . . . . . C.4.d.3
Miles of stream treated through channel structure placement 1.00
- . . . . . . C.4.d.5
Pools expected to be created through channel structure placement 3
- . . . . . . C.4.d.7
Number of structures placed in channel 3
20140197
- Worksite Identifier: 20140197
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Willamette (170900)
- Subbasin: North Santiam (17090005)
- Watershed:
- Subwatershed:
- State: Oregon
- Recovery Domain: Willamette River
- Latitude: 44.55387315
- Longitude: -121.99515829
ESU
- Upper Willamette River Chinook Salmon ESU
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 30,524.58
- . . C.0.b
Length of stream treated/protected .25
- . . C.0.c
| Project identified in a Plan or Watershed Assessment | |
| OWEB Willamette River Basin North Santiam Restoration Priorities/2005/OWEB |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 21,687.09
- . . . . C.4.b
Total length of instream habitat treated .25
- . . . . C.4.d.1
Channel structure placementY (Y/N)
- . . . . . . C.4.d.2
Material used for channel structure (LOV)
- . . . . . . C.4.d.3
Miles of stream treated through channel structure placement .25
- . . . . . . C.4.d.5
Pools expected to be created through channel structure placement 3
- . . . . . . C.4.d.7
Number of structures placed in channel 3
- . . . . C.4.e.1
Streambank stabilization Y (Y/N)
- . . . . . . C.4.e.2
Material Used For Streambank Stabilization (LOV)
- . . . . . . C.4.e.3
Miles of streambank stabilized .10
- . . C.5
Riparian Habitat ProjectY (Y/N)
- . . . . C.5.a
Riparian Habitat Funding 8,837.49
- . . . . C.5.b.1
Total riparian miles streambank treated .25
- . . . . C.5.b.2
Total Riparian Acres Treated 1.0
- . . . . C.5.i.1
Forestry practices/stand managementY (Y/N)
- . . . . . . C.5.i.2
Acres treated for riparian forestry practices/stand management 1.0
20140199
- Worksite Identifier: 20140199
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Willamette (170900)
- Subbasin: North Santiam (17090005)
- Watershed:
- Subwatershed:
- State: Oregon
- Recovery Domain: Willamette River
- Latitude: 44.61269492
- Longitude: -121.94952624
ESU
- Upper Willamette River Chinook Salmon ESU
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 24,937.44
- . . C.0.b
Length of stream treated/protected .20
- . . C.0.c
| Project identified in a Plan or Watershed Assessment | |
| OWEB Willamette River Basin Restoration Priorities/2005/OWEB |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 24,937.44
- . . . . C.4.b
Total length of instream habitat treated .20
- . . . . C.4.d.1
Channel structure placementY (Y/N)
- . . . . . . C.4.d.2
Material used for channel structure (LOV)
- . . . . . . C.4.d.3
Miles of stream treated through channel structure placement .20
- . . . . . . C.4.d.5
Pools expected to be created through channel structure placement 6
- . . . . . . C.4.d.7
Number of structures placed in channel 8
- . . . . C.4.f.1
Spawning gravel placementY (Y/N)
- . . . . . . C.4.f.2
Miles of stream treated with addition of spawning gravel .20
- . . . . . . C.4.f.3
Cubic yards of spawning gravel placed110 (Cubic yards)
20140198
- Worksite Identifier: 20140198
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Willamette (170900)
- Subbasin: North Santiam (17090005)
- Watershed:
- Subwatershed:
- State: Oregon
- Recovery Domain: Willamette River
- Latitude: 44.5841179
- Longitude: -121.98373354
ESU
- Upper Willamette River Chinook Salmon ESU
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 52,194.05
- . . C.0.b
Length of stream treated/protected .50
- . . C.0.c
| Project identified in a Plan or Watershed Assessment | |
| OWEB Willamette River Basin North Santiam Restoration Priorities/2005/OWEB |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 52,194.05
- . . . . C.4.b
Total length of instream habitat treated .50
- . . . . C.4.d.1
Channel structure placementY (Y/N)
- . . . . . . C.4.d.2
Material used for channel structure (LOV)
- . . . . . . C.4.d.3
Miles of stream treated through channel structure placement .50
- . . . . . . C.4.d.5
Pools expected to be created through channel structure placement 2
- . . . . . . C.4.d.7
Number of structures placed in channel 3
|
|