Sucker Creek Channel and Floodplain Restoration - Phase 2 & 2A
Salmonid Habitat Restoration and Acquisition
|
| OWEB 210-2053-7790 | | N CA - S Oregon | | 05/27/2010 | | 11/22/2011 | | 2009 | | Completed | | 10/05/2026 | | |
| |
Description
This project created off-channel alcoves without tributary or spring input; excavated or blasted a pool; managed riparian vegetation; modified or created a main stream channel; placed boulders instream; placed instream anchored habitat structures; placed large wood instream; placed spawning gravel instream; stabilized a stream bank by resloping the bank.
Project Benefit
By creating large wood structures, stream meanders, and off-channel habitats such as alcoves, we expect to provide over-wintering habitat and flood refuge for juvenile salmons and steelhead. These features are especially important for coho salmon. Establishing a stable stream meander pattern,, dimension, and profile will also allow sorting of gravels on point bars and glides, creating salmon and steelhead spawning habitat. Currently the project site has very little spawning habitat because of its large cobble and boulder substrate. Another expected benefit to salmon and steelhead habitat is decrease in stream temperature. By reconstructing some of the channel into an existing heavily-shaded forested area, narrowing the channel width and increasing the depth, and planting, we expect to decrease summer stream temperature. Further, by establishing groundwater channels and excavating deep pools, we expect to create cold water refuges for juvenile salmon, steelhead and resident fish during summer low flows. Deep pools and wood structures will also provide resting area and holding cover for adult salmon and steelhead that migrate upstream of the project site. In addition, reducing current bank erosion will reduce fine sediment delivery and increase gravel permeability in downstream spawning areas.
Accomplishments
| Instream Habitat |
| Stream Miles Treated |
.50 |
|
| Riparian Habitat |
| Stream Miles Treated |
.50 |
|
| Acres Treated |
10.0 |
|
Funding Details |
| State | $198,870 |
| Other | $70,000 |
| In-Kind Donated Labor | $139,847 |
| In-Kind Other | $113,126 |
| Report Total: | $521,843 |
|
| |
Worksites
20100511
- Worksite Identifier: 20100511
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Southern Oregon Coastal (171003)
- Subbasin: Illinois (17100311)
- Watershed:
- Subwatershed:
- State: Oregon
- Recovery Domain: N CA - S Oregon
- Latitude: 42.13223805
- Longitude: -123.46450232
ESU
- Southern Oregon / Northern California Coastal Chinook Salmon ESU
- Southern Oregon/Northern California Coast Coho Salmon ESU
- Klamath Mountains Province Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 521,843.13
- . . C.0.b
Length of stream treated/protected .50
- . . C.0.c
| Project identified in a Plan or Watershed Assessment | |
| Sucker Creek Aquatic Restoration Plan/2007/USFS |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 392,956.44
- . . . . C.4.b
Total length of instream habitat treated .50
- . . . . C.4.c.1
Channel reconfiguration and connectivityY (Y/N)
- . . . . . . C.4.c.2
Type of change to channel configuration and connectivity (LOV)
- . . . . . . C.4.c.3
Miles of stream treated for channel reconfiguration and connectivity .50
- . . . . . . C.4.c.4
Miles of off-channel stream created through channel reconfiguration and connectivity .01
- . . . . . . C.4.c.6
Instream pools created/added through channel reconfiguration and connectivity 4
- . . . . C.4.d.1
Channel structure placementY (Y/N)
- . . . . . . C.4.d.2
Material used for channel structure (LOV)
- . . . . . . C.4.d.3
Miles of stream treated through channel structure placement .50
- . . . . . . C.4.d.5
Pools expected to be created through channel structure placement 14
- . . . . . . C.4.d.7
Number of structures placed in channel 64
- . . . . C.4.e.1
Streambank stabilization Y (Y/N)
- . . . . . . C.4.e.2
Material Used For Streambank Stabilization (LOV)
- . . . . . . C.4.e.3
Miles of streambank stabilized .50
- . . . . C.4.f.1
Spawning gravel placementY (Y/N)
- . . . . . . C.4.f.2
Miles of stream treated with addition of spawning gravel .50
- . . . . . . C.4.f.3
Cubic yards of spawning gravel placed640 (Cubic yards)
- . . C.5
Riparian Habitat ProjectY (Y/N)
- . . . . C.5.a
Riparian Habitat Funding 128,886.69
- . . . . C.5.b.1
Total riparian miles streambank treated .50
- . . . . C.5.b.2
Total Riparian Acres Treated 10.0
- . . . . C.5.i.1
Forestry practices/stand managementY (Y/N)
- . . . . . . C.5.i.2
Acres treated for riparian forestry practices/stand management 10.0
|
|