Doe Creek Culvert Removal
Salmonid Habitat Restoration and Acquisition
|
| OWEB 207-345-5607 | | Snake River | | 06/04/2007 | | 05/22/2008 | | 2006 | | Completed | | 06/24/2025 | | |
| |
Description
This project installed a rock/boulder V structure; modified or created a main stream channel; placed instream anchored habitat structures; placed large wood instream; replaced culverts or structures with open bottom arch culverts.
Project Benefit
OWRI: improve/increase fish passage; improve/increase stream interaction with floodplain; improve/increase stream spawning habitat; improve/increase stream structure & complexity;
Accomplishments
| Instream Habitat |
| Stream Miles Treated |
.05 |
|
| Fish Passage |
| Barriers Removed |
|
|
| Miles Opened |
.50 |
|
Funding Details |
| State | $102,500 |
| Other | $51,323 |
| In-Kind Other | $9,400 |
| Report Total: | $163,223 |
|
| |
Worksites
20070356
- Worksite Identifier: 20070356
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Lower Snake (170601)
- Subbasin: Lower Grande Ronde (17060106)
- Watershed:
- Subwatershed:
- State: Oregon
- Recovery Domain: Snake River
- Latitude: 45.7474189
- Longitude: -117.02291095
ESU
- Snake River Basin Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 163,223.00
- . . C.0.b
Length of stream treated/protected .05
- . . C.0.c
| Project identified in a Plan or Watershed Assessment | |
| Upper Joseph Creek Watershed Assessment |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.2
Fish Passage ImprovementY (Y/N)
- . . . . C.2.a
Fish Passage Funding 152,085.00
- . . . . C.2.b.1
Length of stream made accessible .50
- . . . . C.2.b.3
Type of blockage/barrier (LOV)
- . . . . C.2.b.4
Number of blockages/impediments/barriers impeding passage 1
- . . . . C.2.f.1
Culvert installed or improved at road stream crossingY (Y/N)
- . . . . . . C.2.f.2
Number of culverts installed or improved 1
- . . . . . . C.2.f.3
Miles of stream made accessible by culvert installation/upgrade .50
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 11,138.00
- . . . . C.4.b
Total length of instream habitat treated .05
- . . . . C.4.c.1
Channel reconfiguration and connectivityY (Y/N)
- . . . . . . C.4.c.2
Type of change to channel configuration and connectivity (LOV)
- . . . . . . C.4.c.3
Miles of stream treated for channel reconfiguration and connectivity .04
- . . . . . . C.4.c.4
Miles of off-channel stream created through channel reconfiguration and connectivity .00
- . . . . . . C.4.c.6
Instream pools created/added through channel reconfiguration and connectivity 0
- . . . . C.4.d.1
Channel structure placementY (Y/N)
- . . . . . . C.4.d.2
Material used for channel structure (LOV)
- . . . . . . C.4.d.3
Miles of stream treated through channel structure placement .05
- . . . . . . C.4.d.7
Number of structures placed in channel 4
|
|