Pugh Cr Stream Enhancement
Salmonid Habitat Restoration and Acquisition
|
| OWEB 206-069-1345 | | Oregon Coast | | 10/18/2005 | | 03/05/2007 | | 2005 | | Completed | | 06/24/2025 | | |
| |
Description
This project placed large wood instream; removed culverts or structures and did not replace them; replaced culverts or structures with culverts placed embedded or flat.
Project Benefit
OWRI: improve/increase fish passage; improve/increase stream gravel recruitment; improve/increase stream interaction with floodplain; improve/increase stream over-winter habitat; improve/increase stream pools; improve/increase stream rearing habitat; improve/increase stream spawning habitat; improve/increase stream structure & complexity; improve/increase stream summer habitat;
Accomplishments
| Instream Habitat |
| Stream Miles Treated |
.75 |
|
| Fish Passage |
| Barriers Removed |
|
|
| Miles Opened |
1.85 |
|
Funding Details |
| State | $29,010 |
| In-Kind Donated Labor | $1,500 |
| In-Kind Other | $16,300 |
| Report Total: | $46,810 |
|
| |
Worksites
20060659
- Worksite Identifier: 20060659
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Northern Oregon Coastal (171002)
- Subbasin: Siuslaw (17100206)
- Watershed:
- Subwatershed:
- State: Oregon
- Recovery Domain: Oregon Coast
- Latitude: 43.93130796
- Longitude: -123.5977284
ESU
- Oregon Coast Steelhead DPS
- Oregon Coast Chinook Salmon ESU
- Lower Columbia River Coho Salmon ESU
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 46,809.58
- . . C.0.b
Length of stream treated/protected .75
- . . C.0.c
| Project identified in a Plan or Watershed Assessment | |
| none provided |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.2
Fish Passage ImprovementY (Y/N)
- . . . . C.2.a
Fish Passage Funding 33,734.91
- . . . . C.2.b.1
Length of stream made accessible 1.85
- . . . . C.2.b.3
Type of blockage/barrier (LOV)
- . . . . C.2.b.4
Number of blockages/impediments/barriers impeding passage 3
- . . . . C.2.f.1
Culvert installed or improved at road stream crossingY (Y/N)
- . . . . . . C.2.f.2
Number of culverts installed or improved 2
- . . . . . . C.2.f.3
Miles of stream made accessible by culvert installation/upgrade 1.85
- . . . . C.2.i.1
Road stream crossing removal Y (Y/N)
- . . . . . . C.2.i.2
Number of road crossings removed 1
- . . . . . . C.2.i.3
Miles of stream made accessible by road stream crossing removal 1.85
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 13,074.67
- . . . . C.4.b
Total length of instream habitat treated .75
- . . . . C.4.d.1
Channel structure placementY (Y/N)
- . . . . . . C.4.d.2
Material used for channel structure (LOV)
- . . . . . . C.4.d.3
Miles of stream treated through channel structure placement .75
- . . . . . . C.4.d.7
Number of structures placed in channel 7
|
|