Lower Wenatchee Instream Flow Enhance Phase II

Salmonid Habitat Restoration and Acquisition

Instream Flow
Project ID19-1489 R
Recovery DomainsUpper Columbia River
Start Date12/12/2019
End Date03/31/2025
Year2020
StatusOngoing
Last Edited01/14/2025
 
1 - 1

Description    


The project will implement a comprehensive, large-scale irrigation delivery system efficiency upgrade. The outcome will provide more instream flows to the Wenatchee River, during low flow seasons, thus benefitting ESA-listed Chinook salmon and steelhead trout.

Project Benefit    


To design and build a better irrigation system to save water and dedicate the savings, in the form of cubic feet per second (cfd), back to the Wenatchee River to enhance instream flows thus benefitting ESA-listed spring Chinook and steelhead trout.

Accomplishments

Metric Completed Originally
Proposed

Funding Details

SourceFunds
PCSRF$188,306
Other$2,247,985
Report Total:$2,436,291


Project Map



Worksites

1-Jones Shotwell Ditch Compan    


  • Worksite Identifier: 1-Jones Shotwell Ditch Compan
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Upper Columbia (170200)
  • Subbasin: Wenatchee (17020011)
  • Watershed: Wenatchee River (1702001107)
  • Subwatershed:
  • State: Washington
  • Recovery Domain: Upper Columbia River
  • Latitude: 47.50196967
  • Longitude: -120.42729728

ESU

  • Upper Columbia River Spring-run Chinook Salmon ESU
  • Upper Columbia River Summer- and Fall-run Chinook Salmon ESU
  • Upper Columbia River Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding
    •      . . C.0.b Length of stream treated/protected
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.3 Instream Flow ProjectY (Y/N)
      •      . . . . C.3.a Instream Flow Funding
      •      . . . . C.3.b Length of stream 'protected' for adequate flow
      •      . . . . C.3.c Change in water flow (cfs)
      •      . . . . C.3.e.1 Irrigation practice improvementY (Y/N)
        •      . . . . . . C.3.e.2 Acre feet of water conserved per year (Acre feet)
        •      . . . . . . C.3.e.4 Initial start date of action or agreement (mm/dd/yyyy)
        •      . . . . . . C.3.e.5 Final end date of action or agreement (mm/dd/yyyy)