Methow River EDT High Priority Data Gaps
Salmonid Research, Monitoring, and Evaluation (RM&E)
|
19-1486 M | Upper Columbia River | 12/15/2020 | 12/31/2023 | 2020 | Ongoing | 01/14/2025 | |
| |
Description
The Colville Tribes are proposing this monitoring project to collect sediment data needed to improve the Methow EDT model( https://ecosystems.azurewebsites.net/hstr-methow/ ). Within the Upper Columbia the highest priority data gap for 2019 is to address data collection needs identified within the Methow EDT data gaps assessment ( https://www.okanoganmonitoring.org/Reports/ViewReportsForType/8 ). The data gaps assessment identified the need for improved sediment data in 72 high priority reaches within the Methow River Basin. Data collection will follow standardized Okanogan Basin Monitoring and Evaluation (OBMEP) protocols. Sample processing, data processing and archive will be cost shared by OBMEP. Data will be integrated into the next EDT model run.
Project Benefit
This model measured changes on the landscape that impact salmon survival. The collected data will be integrated into the next EDT model run, which will help focus where future restoration activities could occur.
Accomplishments
Research and Monitoring |
Stream Miles Monitored |
|
72.78 |
Funding Details |
PCSRF | $71,086 |
In-Kind Volunteers | $30,000 |
In-Kind Other | $30,000 |
Report Total: | $131,086 |
|
| |
Worksites
1-Methow River Basin
- Worksite Identifier: 1-Methow River Basin
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Upper Columbia (170200)
- Subbasin: Methow (17020008)
- Watershed: Middle Methow River (1702000806)
- Subwatershed:
- State: Washington
- Recovery Domain: Upper Columbia River
- Latitude: 48.3591407
- Longitude: -120.1148205
ESU
- Upper Columbia River Steelhead DPS
- Upper Columbia River Spring-run Chinook Salmon ESU
Map
Photos
Metrics
Metrics
- E.0
Salmonid Research, Monitoring, and Evaluation (RM&E)Y (Y/N)
- . . E.0.a
RM&E Funding
- . . E.0.b
Complement habitat restoration project | |
|
- . . E.0.c
Project identified in a plan or watershed assessment. | |
|
- . . E.0.d.1
Number of Cooperating Organizations
- . . E.0.d.2
Name Of Cooperating Organizations. | |
|
- . . E.0.e.1
Number of reports prepared
- . . E.0.e.2
- . . E.1
MonitoringY (Y/N)
- . . . . E.1.a
Monitoring funding
- . . . . E.1.b.1
Stream Miles Monitored
- . . . . E.1.b.2
Acres of Watershed Area Monitored
- . . . . E.1.c.11
Habitat condition monitoringY (Y/N)
- . . . . . . E.1.c.11.a
# miles (to nearest 0.01 mile) monitored for habitat condition
- . . . . . . E.1.c.11.c
# acres (to nearest 0.1 acre) monitored
- . . . . E.1.d
Name Of Comprehensive Monitoring Strategy/Program | |
|
|
|