Nason Creek Upper White Pine Reconnection

Salmonid Restoration Planning and Assessments

Restoration Planning And Coordination
Project ID09-1466 P
Recovery DomainsUpper Columbia River
Start Date12/10/2009
End Date06/30/2012
Year2009
StatusCompleted
Last Edited05/01/2025
 
1 - 1

Description    


The primary project objective was to conduct an alternatives analysis (US Bureau of Reclamation), coordinate with the US Forest Service and Chelan PUD, and prepare conceptual designs in order to remove or selectively breach a levee to reconnect 25 acres of off-channel habitat and floodplain in the Upper White Pine Reach of Nason Creek. This reconnection will lead to increased refuge and rearing habitat, increased floodplain connectivity, and the restoration of natural channel processes in the project reach.

Project Benefit    


The goal of the project is to increase/improve information to help select projects that have a high certainty and benefit. The objective of the project is to determine project siting, feasibility, design, or implementation.

Accomplishments

Metric Completed Originally
Proposed

Funding Details

SourceFunds
PCSRF$29,750
Other$10,731
Report Total:$40,481


Project Map



Worksites

1-Nason Creek Upper White Lev    


  • Worksite Identifier: 1-Nason Creek Upper White Lev
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Upper Columbia (170200)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Washington
  • Recovery Domain: Upper Columbia River
  • Latitude: 47.7873527
  • Longitude: -120.8643384

ESU

  • Upper Columbia River Summer- and Fall-run Chinook Salmon ESU
  • Upper Columbia River Steelhead DPS
  • Upper Columbia River Spring-run Chinook Salmon ESU

Map

Photos

Metrics

Metrics
  • B.0 Salmonid Restoration Planning and AssessmentsY (Y/N)
    •      . . B.0.a Planning And Assessment Funding 40,481.00
    •      . . B.0.b.1 Area Encompassed .0
    •      . . B.1 Restoration Planning And CoordinationY (Y/N)
      •      . . . . B.1.a Planning and Coordination funding 40,481.00
      •      . . . . B.1.b.11 Engineering/design work for restoration projectsY (Y/N)
        •      . . . . . . B.1.b.11.a
          Name of plan implemented
          Upper Columbia Salmon Recovery Plan
        •      . . . . . . B.1.b.11.b
          Description and scope of the plan implemented
          Upper Columbia Salmon Recovery Plan