Upper Wenatchee Floodplain Reconnection (RM37-38)
Salmonid Habitat Restoration and Acquisition
|
23-1282 R | Upper Columbia River | 09/14/2023 | 09/30/2025 | 2023 | Ongoing | 01/14/2025 | |
| |
Description
Project is intended to enhance in-stream habitat conditions and better connect an ~55-acre river-left floodplain (and associated channel network) between river miles 36.5 and 37.9 of the upper Wenatchee River. In-stream project-constructed elements will occur between river miles 37.0 and 37.9, and include installation of six engineered log jams, 12 boulder clusters (4-5 large boulders/cluster), and 18 side-channel habitat logs. ELJs are designed to direct flows towards the river-left floodplain and improve mainstem habitats. The boulder clusters and habitat logs are to enhance cover and hydraulic diversity in mainstem and side channel areas. The project also includes excavation of a river left pilot channel to better connect the mainstem channel to the existing floodplain channel network. Under the current design iteration (60% Preliminary Designs), the pilot channel is expected to be ~225 ft long x ~40 ft wide (with a wider, flared inlet).To access work areas, the project will re-open and improve ~1,300 lf of USFS road NF-7906 that was previously closed and partially obliterated by USFS. This road segment will be closed, re-contoured and re-vegetated post-construction. To isolate in-water work areas around ELJs and pilot channel inlet and to get heavy equipment and materials across the Wenatchee River, the project will construct temporary coffer dams and a multi-span, temporary bridge. These features will be removed once in-stream and floodplain work are complete.
Project Benefit
The overall goal of the proposed project is to implement restoration actions that address Limiting Factors identified for Reach 2 of the Wenatchee River-Beaver Creek AU including cover-wood, pool quantity and quality, deep pools, and floodplain connectivity/off-channel side channels. The project will construct restoration treatments developed through an iterative and well-reviewed design process. Specific project goals are: (1) Increase flow connectivity and juvenile fish access to floodplain habitats; (2) Promote lateral channel migration, sediment deposition and sorting, and organic matter retention; and (3) Enhance habitat diversity and quality via increased pools and cover and better floodplain and side channel connectivity. Desired future conditions include a well-connected, river-left floodplain and a complex mainstem channel with more pools and persistent large wood accumulations, and an enhanced capacity for organic matter retention and sediment deposition/sorting to facilitate channel evolution and creation of additional cover, gravel bars and islands, more suitable spawning gravels and other habitat features. Benefits from the proposed actions are expected to be realized very quickly, persist for decades and facilitate subsequent stream evolution. They are expected to improve conditions year-round for a number of steelhead and spring Chinook life stages including summer and winter rearing, spawning, incubation, and holding/maturation.
Accomplishments
Instream Habitat |
Stream Miles Treated |
|
.70 |
Wetland Habitat |
Acres Created |
|
|
Acres Treated |
|
21.1 |
Funding Details |
Other | $1,065,848 |
Report Total: | $1,065,848 |
|
| |
Worksites
1-Upper Wenatchee RM 37-38_Pr
- Worksite Identifier: 1-Upper Wenatchee RM 37-38_Pr
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Upper Columbia (170200)
- Subbasin: Wenatchee (17020011)
- Watershed: Wenatchee River (1702001107)
- Subwatershed:
- State: Washington
- Recovery Domain: Upper Columbia River
- Latitude: 47.69338398
- Longitude: -120.71111704
ESU
- Upper Columbia River Spring-run Chinook Salmon ESU
- Upper Columbia River Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding
- . . C.0.b
Length of stream treated/protected
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
|
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding
- . . . . C.4.b
Total length of instream habitat treated
- . . . . C.4.c.1
Channel reconfiguration and connectivityY (Y/N)
- . . . . . . C.4.c.2
Type of change to channel configuration and connectivity (LOV)
- . . . . . . C.4.c.3
Miles of stream treated for channel reconfiguration and connectivity
- . . . . . . C.4.c.4
Miles of off-channel stream created through channel reconfiguration and connectivity
- . . . . . . C.4.c.5
Acres of off-channel or floodplain connected through channel reconfiguration and connectivity
- . . . . . . C.4.c.6
Instream pools created/added through channel reconfiguration and connectivity
- . . . . C.4.d.1
Channel structure placementY (Y/N)
- . . . . . . C.4.d.2
Material used for channel structure (LOV)
- . . . . . . C.4.d.3
Miles of stream treated through channel structure placement
- . . . . . . C.4.d.5
Pools expected to be created through channel structure placement
- . . . . . . C.4.d.7
Number of structures placed in channel
- . . C.8
Wetland ProjectY (Y/N)
- . . . . C.8.a
Wetland funding
- . . . . C.8.b
Total acres of wetland area treated
- . . . . C.8.e.1
Wetland improvement/restorationY (Y/N)
- . . . . . . C.8.e.2
Acres of wetland treated
2-Upper Wenatchee RM 37-38_St
- Worksite Identifier: 2-Upper Wenatchee RM 37-38_St
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Upper Columbia (170200)
- Subbasin: Wenatchee (17020011)
- Watershed: Wenatchee River (1702001107)
- Subwatershed:
- State: Washington
- Recovery Domain: Upper Columbia River
- Latitude: 47.68410791
- Longitude: -120.7317163
ESU
- Upper Columbia River Spring-run Chinook Salmon ESU
- Upper Columbia River Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding
- . . C.0.b
Length of stream treated/protected
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
|
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding
- . . . . C.4.b
Total length of instream habitat treated
- . . . . C.4.j.1
Unspecified or other instream habitat projectY (Y/N)
- . . . . . . C.4.j.2
Miles treated by unspecified or other instream habitat project
|
|