Patton Crk-Willapa Passage and Restoration Design

Salmonid Restoration Planning and Assessments

Restoration Planning And Coordination
Project ID23-1124 P
Recovery Domains -
Start Date09/14/2023
End Date09/14/2025
Year2023
StatusOngoing
Last Edited11/19/2024
 
1 - 1

Description    


The Willapa Bay Fisheries Enhancement Group is proposing a project to create a design to restore the confluence between Patton Creek and the Willapa River to proper function through the removal of a barrier culvert, replaced with a full passage structure, and returning Patton Creek to its natural flow channel. Design will also fully develop plans to restore the lower portion reach of Patton Creek (.15 Miles) and the Willapa River (1.05 Miles).  This section of the project is referred to as the Lower Project Reach.   A separated design, the Upper Project Reach will also be developed for the restoration of the remainder of Patton Creek above the existing homesite (approximately 4 stream miles).  This section of the project is a significant opportunity to improve the spawning and rearing habitat for salmon and steelhead.  The design will incorporate elements to improve summer water flows and reduce stream temperature through development of cold water refuges.  In all project reaches, design elements will be directed towards improving stream complexity for both fish use and improved hydraulic performance during various flow stages in the system.  The division of the design project into these two project reaches was selected to allow clear transition into separate construction phase projects.     

Project Benefit    


There are several goals central to the proposed project. These goals include development of preliminary designs that if implemented, will accomplish the following: Restore free fish passage of all life stages throughout the project reach focused on the removal of a significant culvert barrier and developing its replacement at the confluence of Patton Creek and the Willapa River. Improve both the quantity and quality of available spawning habitat for coho, chinook and steelhead. Improve both the quantity and quality of available rearing/resting habitat, including side channels, pools, and stream complexity for coho, chinook and steelhead of all life stages. Project design will incorporate diversity of habitat along project reach. Increase summer water flows and decrease water temperatures through improved water storage capacity and development of cold water refuges through strategic placement of LWM to create pools and increase hyporheic exchange. Improved hydraulic performance during high water flows through development and connection with floodplain elements.

Accomplishments

Metric Completed Originally
Proposed

Funding Details

SourceFunds
PCSRF$243,115
Report Total:$243,115


Project Map



Worksites

1-Patton Crk/ Willapa R. Barr    


  • Worksite Identifier: 1-Patton Crk/ Willapa R. Barr
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Washington Coastal (171001)
  • Subbasin: Willapa Bay (17100106)
  • Watershed: Willapa River (1710010603)
  • Subwatershed:
  • State: Washington
  • Recovery Domain:
  • Latitude: 46.53430494
  • Longitude: -123.45798396

ESU

  • Washington Coast Chinook Salmon ESU
  • Southwest Washington Coho Salmon ESU
  • Southwest Washington Steelhead DPS

Map

Photos

Metrics

Metrics
  • B.0 Salmonid Restoration Planning and AssessmentsY (Y/N)
    •      . . B.0.a Planning And Assessment Funding .00
    •      . . B.0.b.1 Area Encompassed
    •      . . B.0.b.2 Stream Miles Affected
    •      . . B.1 Restoration Planning And CoordinationY (Y/N)
      •      . . . . B.1.a Planning and Coordination funding
      •      . . . . B.1.b.11 Engineering/design work for restoration projectsY (Y/N)
        •      . . . . . . B.1.b.11.a
          Name of plan implemented
        •      . . . . . . B.1.b.11.b
          Description and scope of the plan implemented

2-Patton Creek, Upper Project    


  • Worksite Identifier: 2-Patton Creek, Upper Project
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Washington Coastal (171001)
  • Subbasin: Willapa Bay (17100106)
  • Watershed: Willapa River (1710010603)
  • Subwatershed:
  • State: Washington
  • Recovery Domain:
  • Latitude: 46.53448945
  • Longitude: -123.45169686

ESU

  • Washington Coast Chinook Salmon ESU
  • Southwest Washington Coho Salmon ESU
  • Southwest Washington Steelhead DPS

Map

Photos

Metrics

Metrics
  • B.0 Salmonid Restoration Planning and AssessmentsY (Y/N)
    •      . . B.0.a Planning And Assessment Funding .00
    •      . . B.0.b.1 Area Encompassed
    •      . . B.0.b.2 Stream Miles Affected
    •      . . B.1 Restoration Planning And CoordinationY (Y/N)
      •      . . . . B.1.a Planning and Coordination funding
      •      . . . . B.1.b.11 Engineering/design work for restoration projectsY (Y/N)
        •      . . . . . . B.1.b.11.a
          Name of plan implemented
        •      . . . . . . B.1.b.11.b
          Description and scope of the plan implemented