Mill Creek RM 4.5 Planting Implementation
Salmonid Habitat Restoration and Acquisition
|
23-1072 R | - | 09/14/2023 | 06/30/2027 | 2023 | Ongoing | 05/22/2025 | |
| |
Description
Lewis Conservation District will work with Port Blakely Timber Company to plant willows along approximately 1800 feet of stream and 12 acres of land. This project will reconnect the floodplain, remove invasive species and help attract beavers to remake ponds for salmon fry rearing and summer water retention. This is part of the Lewis Conservation District effort to restore the Mill Creek Basin. Port Blakely will be an excellent partner with their commitment to environmental stewardship.
Project Benefit
The goal is to minimize canary grass, reconnect the floodplain, establish 12 acres of willow, and provide cool water during the low flow summer period. Beavers are present downstream of the project site. These natural engineers will harvest the willows and create dams. This will help to flood out the canary grass and help to create habitat that benefits all aquatic life. Coho and other fish will benefit from the increased rearing habitat. This is unique opportunity to improve habitat in partnership with a timber company.
Accomplishments
Riparian Habitat |
Stream Miles Treated |
|
.34 |
Acres Treated |
|
12.0 |
Funding Details |
PCSRF | $117,300 |
State | $40,000 |
Other | $40,000 |
Report Total: | $197,300 |
|
| |
Worksites
1-Restoration Site
- Worksite Identifier: 1-Restoration Site
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Washington Coastal (171001)
- Subbasin:
- Watershed:
- Subwatershed:
- State: Washington
- Recovery Domain:
- Latitude: 46.6798869
- Longitude: -123.06758177
ESU
- Southwest Washington Coho Salmon ESU
- Southwest Washington Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding
- . . C.0.b
Length of stream treated/protected
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
|
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.5
Riparian Habitat ProjectY (Y/N)
- . . . . C.5.a
Riparian Habitat Funding
- . . . . C.5.b.1
Total riparian miles streambank treated
- . . . . C.5.b.2
Total Riparian Acres Treated
- . . . . C.5.c.1
Riparian plantingY (Y/N)
- . . . . . . C.5.c.2
Species of plants planted in riparian | |
|
- . . . . . . C.5.c.3
Acres planted in riparian
- . . . . . . C.5.c.4
Miles of streambank treated with riparian planting
- . . . . C.5.h.1
Riparian plant removal/controlY (Y/N)
- . . . . . . C.5.h.2
Species of plants treated/removed in riparian | |
|
- . . . . . . C.5.h.3
Acres of riparian treated for plant removal/control
- . . . . . . C.5.h.4
Miles of streambank treated for riparian plant removal/control
|
|