SF (Nuxw7íyem) Nesset Phase 2-3 Final Design
Salmonid Restoration Planning and Assessments
|
14-1658 P | Puget Sound | 12/04/2014 | 06/30/2017 | 2014 | Completed | 05/01/2025 | |
| |
Description
The Nooksack Tribe finalized design for restoration of instream habitat in the South Fork Nooksack River, Nesset Reach (Phase 2 reach; RM 10.95-11.4), near Acme, Whatcom County. The goal is to address South Fork Nooksack Chinook limiting factors of lack of key habitat, low habitat diversity, and high water temperatures. Preliminary design was for 23 ELJ’s designed to form pools, create temperature refuges, remove channel constraints, and reconnect the floodplain. Final design is for 5 ELJs in the phase 2 portion of the reach. Specific deliverables include: (1) Final design report and drawings, with design review comments (there were no comments from reviewers); (2) Permit applications submitted to agencies; and (3) Cultural resources compliance. Restoration will also benefit ESA-listed steelhead and bull trout; coho, chum, riverine sockeye, and pink salmon; and cutthroat trout.
South Fork Nooksack early Chinook are essential for ESU recovery, but abundances are critically low. The adjacent favorable landownership through the reach presents a unique opportunity to restore habitat and reconnect floodplains in a relatively unconfined reach of the lower South Fork. The reach is also expected to be heavily used by chinook returning to the Skookum hatchery (two miles upstream) as part of the South Fork Nooksack Chinook population-rebuilding program. Funding this design project advanced priority actions in a priority reach.
Project Benefit
To complete a restoration design for phase 2 of the reach.
Funding Details |
PCSRF | $108,100 |
Other | $22,267 |
Report Total: | $130,367 |
|
| |
Worksites
1-Nesset Phase 2-3
- Worksite Identifier: 1-Nesset Phase 2-3
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Puget Sound (171100)
- Subbasin:
- Watershed:
- Subwatershed:
- State: Washington
- Recovery Domain: Puget Sound
- Latitude: 48.69643346
- Longitude: -122.16718058
ESU
- Un-Named ESU Chum
- Un-Named ESU Coho
- Un-Named ESU Pink
- Un-Named ESU Steelhead
- Puget Sound Chinook Salmon ESU
Map
Photos
Metrics
Metrics
- B.0
Salmonid Restoration Planning and AssessmentsY (Y/N)
- . . B.0.a
Planning And Assessment Funding 130,367.00
- . . B.0.b.1
Area Encompassed 21.0
- . . B.0.b.2
Stream Miles Affected .45
- . . B.1
Restoration Planning And CoordinationY (Y/N)
- . . . . B.1.a
Planning and Coordination funding 130,367.00
- . . . . B.1.b.11
Engineering/design work for restoration projectsY (Y/N)
- . . . . . . B.1.b.11.a
Name of plan implemented | |
Shared Strategy Development Committee. 2007. Puget Sound Salmon Recovery Plan. Seattle, WA. https://www.westcoast.fisheries.noaa.gov/publications/recovery_planning/salmon_steelhead/domains/puget_sound/chinook/pugetsoundchinookrecoveryplan_wo_exec_summary.pdf
|
- . . . . . . B.1.b.11.b
Description and scope of the plan implemented | |
This project will address South Fork Nooksack Chinook limiting factors of lack of key habitat, low habitat diversity, and high water temperatures. Restoring habitat in the Forks is identified on pages 159-160. |
|
|