Upper Wenatchee RM 40.5-41.5 Concept. Design

Salmonid Restoration Planning and Assessments

Restoration Planning And Coordination
Project ID22-1495 P
Recovery DomainsUpper Columbia River
Start Date09/22/2022
End Date09/22/2025
Year2022
StatusOngoing
Last Edited01/14/2025
 
1 - 1

Description    


This project will evaluate the mainstem channel and adjacent floodplain wetland complexes on river left (~RM 40.5-41.5) to identify and develop restoration actions that will improve in-stream conditions, reduce erosion and reconnect the floodplain. This effort will include a focus on engaging with WDNR landowner and one adjacent landowner as part of the concept development process to determine project opportunities. We propose to complete all work necessary to evaluate the site, develop and analyze alternative restoration strategies and prepare conceptual designs for the preferred alternative, and anticipate hiring a contractor to complete tasks including onsite data collection, compilation of existing data, hydraulic modeling, opportunities and constraints analysis, and development of conceptual designs. 

Project Benefit    


Increase the quantity and quality of accessible off-channel rearing habitat for juvenile spring Chinook Salmon and steelhead in the Upper Wenatchee River. Provide winter rearing habitat and refugia-type habitat during spring and other high flow events. Incorporate the restoration of natural processes in the project goals and clarify project constraints in the alternatives development stage.

Accomplishments

Metric Completed Originally
Proposed

Funding Details

SourceFunds
PCSRF$63,750
Other$11,250
Report Total:$75,000


Project Map



Worksites

1-Upper Wenatchee WDNR sec. 3    


  • Worksite Identifier: 1-Upper Wenatchee WDNR sec. 3
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Upper Columbia (170200)
  • Subbasin: Wenatchee (17020011)
  • Watershed: Wenatchee River (1702001107)
  • Subwatershed: Beaver Creek-Wenatchee River (170200110701)
  • State: Washington
  • Recovery Domain: Upper Columbia River
  • Latitude: 47.71263965
  • Longitude: -120.65698791

ESU

  • Upper Columbia River Steelhead DPS
  • Upper Columbia River Spring-run Chinook Salmon ESU

Map

Photos

Metrics

Metrics
  • B.0 Salmonid Restoration Planning and AssessmentsY (Y/N)
    •      . . B.0.a Planning And Assessment Funding
    •      . . B.0.b.1 Area Encompassed
    •      . . B.0.b.2 Stream Miles Affected
    •      . . B.1 Restoration Planning And CoordinationY (Y/N)
      •      . . . . B.1.a Planning and Coordination funding
      •      . . . . B.1.b.11 Engineering/design work for restoration projectsY (Y/N)
        •      . . . . . . B.1.b.11.a
          Name of plan implemented
        •      . . . . . . B.1.b.11.b
          Description and scope of the plan implemented