Upper Wisen Creek Fish Passage Design- Phase 1
Salmonid Restoration Planning and Assessments
|
22-1334 P | - | 09/22/2022 | 06/22/2024 | 2019 | Completed | 05/22/2025 | |
| |
Description
The objective of this project phase was to produce final design and final design deliverables for future fish passage restoration at two fish barrier crossings that will meet RCO Manual 18 final design deliverables and WDFW stream crossing design standards. We/the sponsor completed this objective, and completed the following tasks: quarterly workgroup meetings with project team; design alternatives development; preferred alternative selection; 30%, 60%, and 90% design reviews; site visits; survey, reporting, and compliance. Sponsor organized and facilitated coordination and regular workgroup meetings with engineer and provided updates to North Pacific Coast Lead Entity Group, WDFW, Quileute Tribe staff, and landowner to complete project deliverables.
Project Benefit
The goal of this project is to develop designs to reconnect and restore access to increased spawning and rearing habitat for coho, winter steelhead, and trout in the Wisen Creek Watershed. The desired future condition is road/stream crossing infrastructure for two private road stream crossings that allow fish passage per WDFW standards.
Funding Details |
PCSRF | $76,545 |
Report Total: | $76,545 |
|
| |
Worksites
1-Upper Wisen Creek Barriers
- Worksite Identifier: 1-Upper Wisen Creek Barriers
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Washington Coastal (171001)
- Subbasin:
- Watershed:
- Subwatershed:
- State: Washington
- Recovery Domain:
- Latitude: 48.0649131
- Longitude: -124.14905341
ESU
- Olympic Peninsula Coho Salmon ESU
- Olympic Peninsula Steelhead DPS
Map
Photos
Metrics
Metrics
- B.0
Salmonid Restoration Planning and AssessmentsY (Y/N)
- . . B.0.a
Planning And Assessment Funding 76,545.00
- . . B.0.b.1
Area Encompassed .2
- . . B.0.b.2
Stream Miles Affected .10
- . . B.1
Restoration Planning And CoordinationY (Y/N)
- . . . . B.1.a
Planning and Coordination funding 76,545.00
- . . . . B.1.b.11
Engineering/design work for restoration projectsY (Y/N)
- . . . . . . B.1.b.11.a
Name of plan implemented | |
North Pacific Coast Lead Entity for Salmon Recovery, 2019, North
Pacific Coast (WRIA 20) Salmon Restoration Strategy, University of
WA, Olympic Natural Resource Center, PO Box 1623, Forks, WA North Pacific Coast Lead Entity for Salmon Recovery, 2019, North
Pacific Coast (WRIA 20) Salmon Restoration Strategy, University of
WA, Olympic Natural Resource Center, PO Box 1623, Forks, WA |
- . . . . . . B.1.b.11.b
Description and scope of the plan implemented | |
The Wisen Creek Culvert Replacements Project is noted as “ high Priority” on the Lead Entity Project List, and it is noted as a “priority project” in the body of the Strategy document referenced above The Wisen Creek Culvert Replacements Project is noted as “high
Priority” on the Lead Entity Project List, and it is noted as a “priority
project” in the body of the Strategy document referenced above. |
|
|