The objective of this project phase was to produce final design and final design deliverables for future fish passage restoration at two fish barrier crossings that will meet RCO Manual 18 final design deliverables and WDFW stream crossing design standards. We/the sponsor completed this objective, and completed the following tasks: quarterly workgroup meetings with project team; design alternatives development; preferred alternative selection; 30%, 60%, and 90% design reviews; site visits; survey, reporting, and compliance. Sponsor organized and facilitated coordination and regular workgroup meetings with engineer and provided updates to North Pacific Coast Lead Entity Group, WDFW, Quileute Tribe staff, and landowner to complete project deliverables.

Project Benefit    


The goal of this project is to develop designs to reconnect and restore access to increased spawning and rearing habitat for coho, winter steelhead, and trout in the Wisen Creek Watershed. The desired future condition is road/stream crossing infrastructure for two private road stream crossings that allow fish passage per WDFW standards.

Accomplishments

Metric Completed Originally
Proposed

Funding Details

SourceFunds
PCSRF$76,545
Report Total:$76,545


Project Map



Worksites

1-Upper Wisen Creek Barriers    


  • Worksite Identifier: 1-Upper Wisen Creek Barriers
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Washington Coastal (171001)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Washington
  • Recovery Domain:
  • Latitude: 48.0649131
  • Longitude: -124.14905341

ESU

  • Olympic Peninsula Coho Salmon ESU
  • Olympic Peninsula Steelhead DPS

Map

Photos

Metrics

Metrics
  • B.0 Salmonid Restoration Planning and AssessmentsY (Y/N)
    •      . . B.0.a Planning And Assessment Funding 76,545.00
    •      . . B.0.b.1 Area Encompassed .2
    •      . . B.0.b.2 Stream Miles Affected .10
    •      . . B.1 Restoration Planning And CoordinationY (Y/N)
      •      . . . . B.1.a Planning and Coordination funding 76,545.00
      •      . . . . B.1.b.11 Engineering/design work for restoration projectsY (Y/N)
        •      . . . . . . B.1.b.11.a
          Name of plan implemented
          North Pacific Coast Lead Entity for Salmon Recovery, 2019, North Pacific Coast (WRIA 20) Salmon Restoration Strategy, University of WA, Olympic Natural Resource Center, PO Box 1623, Forks, WA North Pacific Coast Lead Entity for Salmon Recovery, 2019, North Pacific Coast (WRIA 20) Salmon Restoration Strategy, University of WA, Olympic Natural Resource Center, PO Box 1623, Forks, WA
        •      . . . . . . B.1.b.11.b
          Description and scope of the plan implemented
          The Wisen Creek Culvert Replacements Project is noted as “ high Priority” on the Lead Entity Project List, and it is noted as a “priority project” in the body of the Strategy document referenced above The Wisen Creek Culvert Replacements Project is noted as “high Priority” on the Lead Entity Project List, and it is noted as a “priority project” in the body of the Strategy document referenced above.