South Fork Skokomish LWD Enhancement Phase 3
Salmonid Habitat Restoration and Acquisition
|
14-1332 R | Puget Sound | 12/04/2014 | 03/31/2018 | 2014 | Completed | 05/01/2025 | |
| |
Description
This project took place in the Holman Flats area of the Skokomish South Fork. Excess sediment comes from impacted areas in the upper watershed such as the Holman Flats area. This area was logged and cleared and instream LWD was removed in preparation for construction of a new reservoir. The reservoir was not built, which resulted in excess sedimentation and fish habitat degradation. This project expanded on the previously implemented and very successful South Fork LWD Enhancement Phase I and II Projects (PRISM # 06-2302 and 07-1657). This phase of the project extends downstream of Phase I and II, and involved installing 10 engineered log jams and planted 1.1 riparian acres along 0.1 miles of mainstem South Fork Skokomish River. Match for this project was funded by the Floodplains by Design program.
Project Benefit
The goal of this project is to install 18 engineered log jams to increase cover and pools for multiple species of fish.
Accomplishments
Instream Habitat |
Stream Miles Treated |
.51 |
.51 |
Riparian Habitat |
Stream Miles Treated |
.10 |
.10 |
Acres Treated |
1.1 |
1.1 |
Funding Details |
State | $337,729 |
Other | $673,136 |
Report Total: | $1,010,865 |
|
| |
Worksites
1-SF Skokomish River, Holman
- Worksite Identifier: 1-SF Skokomish River, Holman
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Puget Sound (171100)
- Subbasin:
- Watershed:
- Subwatershed:
- State: Washington
- Recovery Domain: Puget Sound
- Latitude: 47.39894534
- Longitude: -123.30854225
ESU
- Puget Sound Steelhead DPS
- Puget Sound Chinook Salmon ESU
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 1,010,863.83
- . . C.0.b
Length of stream treated/protected .51
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
|
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 1,008,754.41
- . . . . C.4.b
Total length of instream habitat treated .51
- . . . . C.4.d.1
Channel structure placementY (Y/N)
- . . . . . . C.4.d.2
Material used for channel structure (LOV)
- . . . . . . C.4.d.3
Miles of stream treated through channel structure placement .51
- . . . . . . C.4.d.4
Acres of streambed treated through channel structure placement 1.6
- . . . . . . C.4.d.5
Pools expected to be created through channel structure placement 8
- . . . . . . C.4.d.7
Number of structures placed in channel 10
- . . C.5
Riparian Habitat ProjectY (Y/N)
- . . . . C.5.a
Riparian Habitat Funding 2,109.42
- . . . . C.5.b.1
Total riparian miles streambank treated .10
- . . . . C.5.b.2
Total Riparian Acres Treated 1.1
- . . . . C.5.c.1
Riparian plantingY (Y/N)
- . . . . . . C.5.c.2
Species of plants planted in riparian | |
Sitka Spruce, Hemlock, Douglas Fir, Western Red Cedar, Grand Fir |
- . . . . . . C.5.c.3
Acres planted in riparian 1.1
- . . . . . . C.5.c.4
Miles of streambank treated with riparian planting .10
|
|