Gibbs- Chumstick Creek R5
Salmonid Habitat Restoration and Acquisition
|
06-2311 R | Upper Columbia River | 12/01/2010 | 05/31/2013 | 2008 | Completed | 05/01/2025 | |
| |
Description
There were two sites on Freund Canyon Creek, site B is upstream of site A. The culvert at site A had nick point about 5m downstream of the outlet. Nick point had a 1.2m drop below which the channel was scoured and unstable. Landowner says nick point was migrating upstream about 50 ft per year. At site B, high flows overtoped culvert. The stream has excellent spawning gravels and is well forested. WRIA: 45 River System: Wenatchee US Barriers: Bad barrier culvert about 0.10 miles upstream on south fork. DS Barriers: 3 partial barriers.
This project replaced 2 barrier culverts with fish passable structures, one culvert and one bridge.
Project Benefit
The goal of the project was to connect isolated habitat to increase the range and distribution of salmon.
The objective of the project was to increase access to areas blocked by human-caused impediments.
Accomplishments
Fish Passage |
Barriers Removed |
|
|
Miles Opened |
1.00 |
1.00 |
Funding Details |
State | $163,238 |
In-Kind Volunteers | $441 |
In-Kind Other | $1,559 |
Report Total: | $165,238 |
|
| |
Worksites
1-Gibbs - Chumstick Barriers
- Worksite Identifier: 1-Gibbs - Chumstick Barriers
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Upper Columbia (170200)
- Subbasin:
- Watershed:
- Subwatershed:
- State: Washington
- Recovery Domain: Upper Columbia River
- Latitude: 47.62907068
- Longitude: -120.64948607
ESU
- Upper Columbia River Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 165,238.22
- . . C.0.b
Length of stream treated/protected .02
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
N/A |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.2
Fish Passage ImprovementY (Y/N)
- . . . . C.2.a
Fish Passage Funding 165,238.22
- . . . . C.2.b.1
Length of stream made accessible 1.00
- . . . . C.2.b.3
Type of blockage/barrier (LOV)
- . . . . C.2.b.4
Number of blockages/impediments/barriers impeding passage 2
- . . . . C.2.f.1
Culvert installed or improved at road stream crossingY (Y/N)
- . . . . . . C.2.f.2
Number of culverts installed or improved 1
- . . . . . . C.2.f.3
Miles of stream made accessible by culvert installation/upgrade 1.00
- . . . . C.2.g.1
Bridge installed or improved at road stream crossingY (Y/N)
- . . . . . . C.2.g.2
Number of bridges installed or improved/upgraded 1
- . . . . . . C.2.g.3
Miles of stream made accessible by bridge installation or improvement/upgrade 1.00
|
|