North Meander Reconnection - Wood Placement
Salmonid Habitat Restoration and Acquisition
|
| 14-1289 R | | Puget Sound | | 09/19/2014 | | 12/30/2016 | | 2014 | | Terminated | | 05/12/2026 | | |
| |
Description
Snohomish County built on the successfully completed North Meander Slough Reconnection and Phase II projects (PRISM #01-1307 and #05-1605), located on the island of Silvana, between Cook Slough and the Stillaguamish River. This project was a design and construct project. We were unable to construct. However, we did complete design plans and obtained permits for future construction.
We collected information of the existing conditions in the North Meander including: channel profile, existing wood material locations and condition, access, and potential wood material placement locations. We used this information and observations to identify three locations for proposed engineered log jams (ELJ). We developed a typical design for boulder ballasted ELJs using 29 logs and 16 boulders, with additional woody debris for racking material.
We obtained all necessary permit including: HPA, Flood Hazard, Corps Nationwide, and approval from USFW.
Project Benefit
Restoration project goal is to establish high-quality, off-channel rearing and refuge habitat for juvenile Chinook and other salmon.
Accomplishments
| Instream Habitat |
| Stream Miles Treated |
.00 |
.60 |
| Riparian Habitat |
| Stream Miles Treated |
.00 |
1.20 |
| Acres Treated |
.0 |
2.5 |
Funding Details |
| State | $50,422 |
| Other | $8,898 |
| Report Total: | $59,320 |
|
| |
Worksites
1-North Meander Silvana Islan
- Worksite Identifier: 1-North Meander Silvana Islan
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Puget Sound (171100)
- Subbasin:
- Watershed:
- Subwatershed:
- State:
- Recovery Domain: Puget Sound
- Latitude: 48.20030546
- Longitude: -122.23072245
ESU
- Puget Sound/Strait of Georgia Chum Salmon ESU
- Puget Sound Steelhead DPS
- Un-Named ESU Pink
- Puget Sound Chinook Salmon ESU
- Puget Sound/Strait of Georgia Coho Salmon ESU
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding .00
- . . C.0.b
Length of stream treated/protected .00
- . . C.0.c
| Project identified in a Plan or Watershed Assessment | |
|
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding .00
- . . . . C.4.b
Total length of instream habitat treated .00
- . . . . C.4.d.1
Channel structure placementY (Y/N)
- . . . . . . C.4.d.2
Material used for channel structure (LOV)
- . . . . . . C.4.d.3
Miles of stream treated through channel structure placement .00
- . . . . . . C.4.d.4
Acres of streambed treated through channel structure placement .0
- . . . . . . C.4.d.5
Pools expected to be created through channel structure placement 0
- . . . . . . C.4.d.7
Number of structures placed in channel 0
- . . C.5
Riparian Habitat ProjectY (Y/N)
- . . . . C.5.a
Riparian Habitat Funding .00
- . . . . C.5.b.1
Total riparian miles streambank treated .00
- . . . . C.5.b.2
Total Riparian Acres Treated .0
- . . . . C.5.c.1
Riparian plantingY (Y/N)
- . . . . . . C.5.c.2
| Species of plants planted in riparian | |
| None |
- . . . . . . C.5.c.3
Acres planted in riparian .0
- . . . . . . C.5.c.4
Miles of streambank treated with riparian planting .00
- . . . . C.5.h.1
Riparian plant removal/controlY (Y/N)
- . . . . . . C.5.h.2
| Species of plants treated/removed in riparian | |
| None |
- . . . . . . C.5.h.3
Acres of riparian treated for plant removal/control .0
- . . . . . . C.5.h.4
Miles of streambank treated for riparian plant removal/control .00
|
|