RegM-Entiat River Fish Monitoring
Salmonid Research, Monitoring, and Evaluation (RM&E)
|
21-1184 M | Upper Columbia River | 11/01/2021 | 06/30/2023 | 2021 | Completed | 01/14/2025 | |
| |
Description
Throughout the 2022 field season, partners carried out extensive monitoring of populations of sub-yearling Chinook salmon and steelhead trout in the Entiat River, with focus on a comprehensive look at whether recent restoration in the Middle Valley Segment of the river has had benefits that have been previously identified for restored sites in the Upper and Lower Valley Segments. Methods included extensive snorkel surveys and mark-recapture assays to assess habitat selection relative to habitat enhancements from engineered log jams (ELJs). From the data collected during the 2022 field season, throughout the remainder of 2022 and first half of 2023, partners performed detailed analysis, produced a final report, and presented findings to the public.
Project Benefit
Assess the effects of restoration elements by monitoring the response of salmonids throughout Entiat River. Also, supporting a larger pilot project of remote sensing with ground truthing remote surveys
Accomplishments
Research and Monitoring |
Stream Miles Monitored |
9.50 |
9.50 |
Funding Details |
PCSRF | $45,380 |
Other | $82,754 |
In-Kind Volunteers | $45,859 |
Report Total: | $173,993 |
|
| |
Worksites
1-Entiat River
- Worksite Identifier: 1-Entiat River
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Upper Columbia (170200)
- Subbasin: Upper Columbia-Entiat (17020010)
- Watershed: Entiat River (1702001002)
- Subwatershed: Potato Creek-Entiat River (170200100207)
- State: Washington
- Recovery Domain: Upper Columbia River
- Latitude: 47.84032904
- Longitude: -120.41604568
ESU
- Upper Columbia River Spring-run Chinook Salmon ESU
- Upper Columbia River Steelhead DPS
Map
Photos
Metrics
Metrics
- E.0
Salmonid Research, Monitoring, and Evaluation (RM&E)Y (Y/N)
- . . E.0.a
RM&E Funding 173,993.00
- . . E.0.b
Complement habitat restoration project | |
Middle Entiat Habitat Restoration Project.
Project Sponsor: Chelan County, Yakama Nation, Chelan Douglas Land Trust, Cascadia Conservation District |
- . . E.0.c
Project identified in a plan or watershed assessment. | |
Upper Columbia Salmon Recovery Plan. |
- . . E.0.d.1
Number of Cooperating Organizations 5
- . . E.0.d.2
Name Of Cooperating Organizations. | |
Chelan County
Bureau of Reclamation
Chelan Douglas Land Trust
Cascadia Conservation District
Pacific Northwest Research Station - USDA Forest Service |
- . . E.0.e.1
Number of reports prepared 1
- . . E.0.e.2
Name Of Report | |
Griep, Polivka, van den Broek, Holland, March 8, 2023, "Post-restoration monitoring of fish
populations in the Entiat River, WA" |
- . . E.1
MonitoringY (Y/N)
- . . . . E.1.a
Monitoring funding 173,993.00
- . . . . E.1.b.1
Stream Miles Monitored 9.50
- . . . . E.1.b.2
Acres of Watershed Area Monitored 89.5
- . . . . E.1.c.13
Restoration effectiveness monitoringY (Y/N)
- . . . . . . E.1.c.13.a
# miles (to nearest 0.01 mile) of stream or streambank monitored 9.50
- . . . . . . E.1.c.13.c
# acres (to nearest 0.1 acre) monitored 89.5
- . . . . E.1.d
Name Of Comprehensive Monitoring Strategy/Program | |
Upper Columbia Regional Technical Team. 2017. A Strategy to Protect and Restore Salmonid Habitat in the Upper Columbia Region. Upper Columbia Salmon Recovery Board. |
|
|