Description
The Wenatchee-Entiat Beaver-Powered Restoration project continued landowner assistance, beaver relocation, and installation of low-tech structures, including beaver dam analogs (BDAs) and Post-Assisted Log Structures (PALs) in new stream reaches. Over the course of a two-year period, the project assisted 12 landowners, captured 10 and relocated 8 beavers, and installed 22 instream wood structures in Alder Creek. Through these three beaver-powered restoration techniques we restored and conserved important natural stream and habitat processes, such as pool quality and quantity, floodplain reconnection, late season flow and wildfire resiliency. Beaver relocation and landowner assistance occurred in multiple locations along the Columbia River, Wenatchee River, and various sites within the upper Wenatchee subbasin. Low tech structures were implemented within the Upper Wenatchee Assessment Unit and funded through support from the HCP Tributary Committee.
Project Benefit
To relocate nuisance beavers to areas for improved cool water storage, thus increasing instream flows during low flow season. To install small beaver dam analog (BDAs) in small tributary streams to improve instream habitat complexity and reconnect floodplain areas for rearing habitat. Both techniques are designed to improve habitat conditions for ESA-listed salmon and steelhead.
Accomplishments
Instream Habitat |
Stream Miles Treated |
.52 |
1.00 |
Funding Details |
State | $29,669 |
In-Kind Donated Labor | $5,633 |
Report Total: | $35,302 |
|
| |
Worksites
1-Wenatchee-Entiat Beaver Rel
- Worksite Identifier: 1-Wenatchee-Entiat Beaver Rel
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Upper Columbia (170200)
- Subbasin: Wenatchee (17020011)
- Watershed: Icicle Creek (1702001104)
- Subwatershed: Lower Icicle Creek (170200110406)
- State: Washington
- Recovery Domain: Upper Columbia River
- Latitude: 47.55855164
- Longitude: -120.67485069
ESU
- Upper Columbia River Steelhead DPS
- Upper Columbia River Spring-run Chinook Salmon ESU
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 35,302.00
- . . C.0.b
Length of stream treated/protected .52
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
|
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 35,302.00
- . . . . C.4.b
Total length of instream habitat treated .52
- . . . . C.4.d.1
Channel structure placementY (Y/N)
- . . . . . . C.4.d.2
Material used for channel structure (LOV)
- . . . . . . C.4.d.3
Miles of stream treated through channel structure placement .36
- . . . . . . C.4.d.5
Pools expected to be created through channel structure placement 5
- . . . . . . C.4.d.7
Number of structures placed in channel 22
- . . . . C.4.h.1
BeaversY (Y/N)
- . . . . . . C.4.h.2
Number of beavers introduced 8
|
|