Nason Crk RM 12 Floodplain Reconnection
Salmonid Restoration Planning and Assessments
|
21-1171 P | Upper Columbia River | 09/23/2021 | 09/23/2023 | 2021 | Completed | 01/14/2025 | |
| |
Description
This project evaluated the mainstem channel and adjacent floodplains on river left and right (~RM 12.0-11.5) to identify and develop restoration actions that will improve in-stream conditions and reconnect the floodplain. We completed work necessary to evaluate the site, developed and analyzed alternative restoration strategies and prepared conceptual and preliminary designs for the preferred alternative (these were uploaded to PRISM). We hired a contractor to complete tasks including on-site data collection (land survey, characterization of in-stream and wetland habitats, etc.), compilation of existing data, hydraulic modeling, opportunities and constraints analysis, and development of conceptual and preliminary engineering designs (and oversaw and assisted in the process).
Project Benefit
The project goal is to collect data on existing conditions, evaluate potential restoration actions and develop Conceptual and Preliminary designs for the project area.
Potential restoration actions developed and reviewed during this phase of the project mimic the structure and complexity provided in natural systems. They included engineered log jams, constructed rock/log riffles, and side channel excavation.
The design strategy is to: • Increase habitat complexity and pools. • Recruit wood and channel forming substrate. • Reconnect disconnected side channels and floodplain habitats (disconnected by channel incision). • Promote stream/side channel shading and/or narrowing to reduce solar heating.
Goal 1: Increase quantity and quality of adult holding and spawning habitats.
Goal 2: Increase quantity and quality of juvenile rearing habitat.
Goal 3: Improve floodplain connectivity to improve aquatic habitat quality, water storage, and riparian health.
Goal 4: Reduce stream temperature impacts
Funding Details |
State | $95,200 |
Other | $16,800 |
Report Total: | $112,000 |
|
| |
Worksites
1-Nason Creek RM 12
- Worksite Identifier: 1-Nason Creek RM 12
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Upper Columbia (170200)
- Subbasin: Wenatchee (17020011)
- Watershed: Nason Creek (1702001102)
- Subwatershed: Lower Nason Creek (170200110203)
- State: Washington
- Recovery Domain: Upper Columbia River
- Latitude: 47.78527077
- Longitude: -120.84704231
ESU
- Upper Columbia River Spring-run Chinook Salmon ESU
- Upper Columbia River Steelhead DPS
Map
Photos
Metrics
Metrics
- B.0
Salmonid Restoration Planning and AssessmentsY (Y/N)
- . . B.0.a
Planning And Assessment Funding 112,000.00
- . . B.0.b.1
Area Encompassed 23.7
- . . B.0.b.2
Stream Miles Affected .37
- . . B.1
Restoration Planning And CoordinationY (Y/N)
- . . . . B.1.a
Planning and Coordination funding 112,000.00
- . . . . B.1.b.11
Engineering/design work for restoration projectsY (Y/N)
- . . . . . . B.1.b.11.a
Name of plan implemented | |
This project was not called out specifically in a Recovery Plan. However, it does address several factors identified in regional restoration prioritization efforts and in reach/tributary assessments completed for lower Nason Creek. |
- . . . . . . B.1.b.11.b
Description and scope of the plan implemented | |
None.
This project area was not called out specifically in a Recovery Plan |
|
|