Fletcher Bay Rd Culvert Removal Design
Salmonid Restoration Planning and Assessments
|
| 21-1058 P | | Puget Sound | | 09/23/2021 | | 09/15/2024 | | 2021 | | Completed | | 05/12/2026 | | |
| |
Description
The City of Bainbridge Island advanced the conceptual designs for a fish passable road crossing at Fletcher Bay Rd NE and Springbrook Creek to the 30% level with assistance from Salmon Recovery Funding Board funds. During the design process the City had fruitful interactions with multiple stakeholders including the Suquamish Tribe, Department of Fish and Wildlife, Bainbridge Island Land Trust, Wild Fish Conservancy, Salmon Recovery Funding Board and community members. These discussions steered the design toward a crossing that will be resilient to higher flows and let fish in all life stages move up and down the stream corridor. The design team worked with the City to understand the constraints of building a free spanning bridge at this location and found alternatives to the conceptual design that would work to achieve all the fish passage goals with less site impact.
Project Benefit
The goal of the project is to design a fish passable, replacement crossing structure for the failing culvert and fishway currently conveying Springbrook Creek under Fletcher Bay Road.
Funding Details |
| State | $71,140 |
| Other | $179,352 |
| Report Total: | $250,492 |
|
| |
Worksites
1-Springbrook Creek at Fletch
- Worksite Identifier: 1-Springbrook Creek at Fletch
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Puget Sound (171100)
- Subbasin:
- Watershed:
- Subwatershed:
- State:
- Recovery Domain: Puget Sound
- Latitude: 47.64311094
- Longitude: -122.56735776
ESU
- Puget Sound/Strait of Georgia Coho Salmon ESU
- Puget Sound/Strait of Georgia Chum Salmon ESU
- Puget Sound Steelhead DPS
Map
Photos
Metrics
Metrics
- B.0
Salmonid Restoration Planning and AssessmentsY (Y/N)
- . . B.0.a
Planning And Assessment Funding 250,492.00
- . . B.0.b.1
Area Encompassed 3.9
- . . B.0.b.2
Stream Miles Affected .08
- . . B.1
Restoration Planning And CoordinationY (Y/N)
- . . . . B.1.a
Planning and Coordination funding 250,492.00
- . . . . B.1.b.11
Engineering/design work for restoration projectsY (Y/N)
- . . . . . . B.1.b.11.a
| Name of plan implemented | |
| Springbrook Creek Watershed Assessment (Bainbridge Island Land Trust 2018). East Kitsap DIP Steelhead recovery Plan (Suquamish Tribe 2020). East Kitsap Chapter of Puget Sound Recovery Plan (2005). |
- . . . . . . B.1.b.11.b
| Description and scope of the plan implemented | |
| Highest priority project in the Springbrook Creek Watershed Assessment (pg. 87-88, Appendix III). |
|
|