Mainstem Touchet Project Area 01 Design
Salmonid Restoration Planning and Assessments
|
| 21-1015 P | | Middle Columbia River | | 09/23/2021 | | 06/30/2023 | | 2021 | | Completed | | 05/12/2026 | | |
| |
Description
The Walla Walla County Conservation District completed a preliminary engineered design for fish habitat restoration on the mainstem project area (PA) 1 located west of the City of Prescott in Walla Walla County, Washington. This area was identified in the Upper Touchet Basin Plan (2020) as a tier 1 high priority. The site is within a major spawning area for ESA list mid-Columbia River steelhead as identified in the Snake River Salmon Recovery Plan (2011). The overall goal was to create a preliminary engineered design incorporating a series of engineered log structures and bank cuts along one mile to benefit mid-Columbia steelhead adult holding and juvenile rearing and bull trout habitat. The intent of the design was to restore natural river processes including increased channel roughness elements, promote sediment sorting and storage, and large wood features.
Project Benefit
This project aimed to produce a preliminary design for stream restoration in the Touchet MS1 project area. The goal of the design was to restore spawning, rearing, and overwintering habitat for Mid-Columbia steelhead, spring Chinook salmon, and bull trout. The produced design accomplishes this through engineered logjams and pilot cuts to increase habitat diversity and floodplain connection.
Funding Details |
| State | $100,287 |
| Report Total: | $100,287 |
|
| |
Worksites
1-TR-MS1
- Worksite Identifier: 1-TR-MS1
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Middle Columbia (170701)
- Subbasin:
- Watershed:
- Subwatershed:
- State:
- Recovery Domain: Middle Columbia River
- Latitude: 46.29475373
- Longitude: -118.3395059
ESU
- Middle Columbia River Steelhead DPS
Map
Photos
Metrics
Metrics
- B.0
Salmonid Restoration Planning and AssessmentsY (Y/N)
- . . B.0.a
Planning And Assessment Funding 100,287.00
- . . B.0.b.1
Area Encompassed 61.0
- . . B.0.b.2
Stream Miles Affected 1.00
- . . B.1
Restoration Planning And CoordinationY (Y/N)
- . . . . B.1.a
Planning and Coordination funding 100,287.00
- . . . . B.1.b.11
Engineering/design work for restoration projectsY (Y/N)
- . . . . . . B.1.b.11.a
| Name of plan implemented | |
| Northwest Marine Fisheries Service. 2009. Middle Columbia River Steelhead Distinct Population Segment ESA Recovery Plan. Portland, OR.
This project was identified as a Tier 1 High Priority Project Area in the Upper Coppei Creek Reach with a Basin Rank of 10 (Appendix I, pg I-40, CCD, 2020). |
- . . . . . . B.1.b.11.b
| Description and scope of the plan implemented | |
| This project is identified as a Priority Restoration Reach and Major Spawning Area for Mid-Columbia Steelhead in the Snake River Salmon Recovery Plan and 3yr Work Plan. |
|
|