Middle Entiat Floodplain - remote sensing IAA
Salmonid Research, Monitoring, and Evaluation (RM&E)
|
21-1156 M | Upper Columbia River | 04/09/2021 | 06/30/2023 | 2019 | Completed | 01/14/2025 | |
| |
Description
Following Implementation of Middle Entiat projects during 2019 and 2020, Cramer Fish Sciences (CFS), ICF, and CCNRD staff collected as-built data to account for earthwork/constructed features that were created during implementation, rather then due to natural processes. Not receiving high enough flow to trigger monitoring in 2021, CCNRD asked for a 1-year extension to complete post-project surveys in late summer/early fall of 2022, and subsequent analysis in late 2022 and early 2023. Acquisition of green LiDAR, habitat surveys, snorkel surveys, eDNA, and associated analysis was completed throughout the late summer into mid-winter months. Using the data collected, CFS developed a report that details and evaluates the physical and biological changes before and after restoration. Furthermore, the report evaluates the effectiveness of project design elements and offers adaptive management and future monitoring recommendations.
Project Benefit
This project conducted remote sensing of habitat conditions following flood flows and debris torrents.
Accomplishments
Research and Monitoring |
Stream Miles Monitored |
4.60 |
1.00 |
Funding Details |
PCSRF | $95,000 |
In-Kind Other | $35,000 |
Report Total: | $130,000 |
|
| |
Worksites
1-upper entiat floodplain
- Worksite Identifier: 1-upper entiat floodplain
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Upper Columbia (170200)
- Subbasin: Upper Columbia-Entiat (17020010)
- Watershed: Entiat River (1702001002)
- Subwatershed: Mills Creek-Entiat River (170200100209)
- State: Washington
- Recovery Domain: Upper Columbia River
- Latitude: 47.72573796
- Longitude: -120.35177642
ESU
- Upper Columbia River Spring-run Chinook Salmon ESU
Map
Photos
Metrics
Metrics
- E.0
Salmonid Research, Monitoring, and Evaluation (RM&E)Y (Y/N)
- . . E.0.a
RM&E Funding 130,000.00
- . . E.0.b
Complement habitat restoration project | |
Numerous restoration and projects have been completed in this reach of the Entiat in Reaches B, C, D, E and F of the Bureau of Reclamation Stormy-Gray Reach Assessment. Project sponsors have included Chelan County and Cascadia Conservation District. |
- . . E.0.c
Project identified in a plan or watershed assessment. | |
Roni, et.al. 2018 Middle Entiat Monitoring Plan |
- . . E.0.d.1
Number of Cooperating Organizations 4
- . . E.0.d.2
Name Of Cooperating Organizations. | |
Upper Columbia Salmon Recovery Region
Chelan County Natural Resources Dept
Bureau of Reclamation
Chelan-Douglas Land Trust
|
- . . E.0.e.1
Number of reports prepared 3
- . . E.0.e.2
Name Of Report | |
Roni, et.al. 2018 Middle Entiat Monitoring Plan
Roni, et.al. 2020 Floodplain Restoration Monitoring Utilizing Remote Sensing
Roni, et.al. 2023, Middle Entiat Restoration Effectiveness Monitoring Pilot Project |
- . . E.1
MonitoringY (Y/N)
- . . . . E.1.a
Monitoring funding 130,000.00
- . . . . E.1.b.1
Stream Miles Monitored 4.60
- . . . . E.1.b.2
Acres of Watershed Area Monitored 486.0
- . . . . E.1.c.11
Habitat condition monitoringY (Y/N)
- . . . . . . E.1.c.11.a
# miles (to nearest 0.01 mile) monitored for habitat condition 4.60
- . . . . . . E.1.c.11.c
# acres (to nearest 0.1 acre) monitored 80.8
- . . . . E.1.d
Name Of Comprehensive Monitoring Strategy/Program | |
Roni, et.al. 2018 Middle Entiat Monitoring Plan
|
|
|