Couse Creek PA 78 Design

Salmonid Restoration Planning and Assessments

Restoration Planning And Coordination
Project ID20-1054 P
Recovery DomainsSnake River
Start Date09/16/2020
End Date10/31/2022
Year2020
StatusCompleted
Last Edited05/01/2025
 
1 - 1

Description    


The Asotin County Conservation District sponsored the Couse Creek Project Area (PA) 78 Design project to develop a full final design report, ready to construct engineering plans, and complete environmental compliance including permit and other requirements. PA 78 is identified as a Tier 1 project in the Asotin County Conceptual Restoration Plan. There is an existing stream buffer in place through the Conservation Reserve Enhancement Program (CREP). The design report and engineering plans for PA 78 includes improving access to flood channels, controlling invasive vegetation encroachment and organizing boulder clusters and add large woody debris to increase complexity to benefit Snake River steelhead. This project has funding secured to implement the designs that were completed by this project.

Project Benefit    


The project will increase access to flood channels which will improve floodplain connection, promote riparian function, and provide instream habitat complexity through the placement of large wood structures and boulder clusters, to enhance juvenile Snake River steelhead habitat for all life stages.

Accomplishments

Metric Completed Originally
Proposed

Funding Details

SourceFunds
PCSRF$79,357
Other$31,404
Report Total:$110,761


Project Map



Worksites

1-Couse Creek - PA 78    


  • Worksite Identifier: 1-Couse Creek - PA 78
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Lower Snake (170601)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Washington
  • Recovery Domain: Snake River
  • Latitude: 46.20039581
  • Longitude: -116.97996943

ESU

  • Snake River Basin Steelhead DPS

Map

Photos

Metrics

Metrics
  • B.0 Salmonid Restoration Planning and AssessmentsY (Y/N)
    •      . . B.0.a Planning And Assessment Funding 110,761.00
    •      . . B.0.b.1 Area Encompassed 31.0
    •      . . B.0.b.2 Stream Miles Affected 1.30
    •      . . B.1 Restoration Planning And CoordinationY (Y/N)
      •      . . . . B.1.a Planning and Coordination funding 110,761.00
      •      . . . . B.1.b.11 Engineering/design work for restoration projectsY (Y/N)
        •      . . . . . . B.1.b.11.a
          Name of plan implemented
          Northwest Marine Fisheries Service. 2017. ESA Recovery Plan for Snake River Spring/Summer Chinook Salmon (Oncorhynchus tshawytscha) & Snake River Basin Steelhead (Oncorhynchus mykiss). Portland, OR. Asotin county watershed assessment and Conceptual Restoration Plan
        •      . . . . . . B.1.b.11.b
          Description and scope of the plan implemented
          This project is identified as a top priority and located in a minor spawning area for Steelhead and a priority restoration reach in the Snake River Salmon Recovery Plan and 3 yr workplan.