Touchet River Mile 42 Design
Salmonid Restoration Planning and Assessments
|
20-1035 P | Middle Columbia River | 09/16/2020 | 03/16/2022 | 2020 | Completed | 05/01/2025 | |
| |
Description
The Walla Walla County Conservation District hired an engineering team and they created final engineered designs for a fish habitat restoration project. The overall goals of the engineered design are to restore natural riverine processes including increased channel roughness elements, promote sediment sorting and storage, and create a dynamic floodplain and instream environment with complex side channels and large wood features. The project, when constructed, will provide Mid-Columbia steelhead adult holding and juvenile rearing habitat, bull trout overwintering habitat, and spring Chinook passage and holding habitat. A geotechnical memo is included in the engineering report. An alternatives analysis was completed in Oct. 2021, preliminary design Jan. 2022 and final design March 2022. Each stage was reviewed with select stakeholders and RCO review panel members as appropriate. The design includes approximately 2 pilot cuts, 4 pile fields, and 28 engineered log jams.
Project Benefit
The overall goals were to create an engineered design that when constructed would restore natural riverine processes including increased channel roughness elements, promote sediment sorting and storage, and create a dynamic floodplain and instream environment with complex side channels and large wood features. This work will benefit Snake River steelhead and Chinook.
Funding Details |
PCSRF | $95,648 |
Other | $6,592 |
Report Total: | $102,240 |
|
| |
Worksites
1-Touchet River Mile 42
- Worksite Identifier: 1-Touchet River Mile 42
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Middle Columbia (170701)
- Subbasin:
- Watershed:
- Subwatershed:
- State: Washington
- Recovery Domain: Middle Columbia River
- Latitude: 46.27583058
- Longitude: -118.19247061
ESU
- Mid-Columbia River Spring-run Chinook Salmon ESU
- Middle Columbia River Steelhead DPS
Map
Photos
Metrics
Metrics
- B.0
Salmonid Restoration Planning and AssessmentsY (Y/N)
- . . B.0.a
Planning And Assessment Funding 102,240.00
- . . B.0.b.1
Area Encompassed 65.2
- . . B.0.b.2
Stream Miles Affected 1.00
- . . B.1
Restoration Planning And CoordinationY (Y/N)
- . . . . B.1.a
Planning and Coordination funding 102,240.00
- . . . . B.1.b.11
Engineering/design work for restoration projectsY (Y/N)
- . . . . . . B.1.b.11.a
Name of plan implemented | |
Northwest Marine Fisheries Service. 2009. Middle Columbia River Steelhead Distinct Population Segment ESA Recovery Plan. Portland, OR. |
- . . . . . . B.1.b.11.b
Description and scope of the plan implemented | |
This project is identified as a top priority and located in a major spawning area for Steelhead and a priority restoration reach in the Snake River Salmon Recovery Plan and 3 yr workplan. |
|
|