FY 2024 Lake Ozette Sockeye Calcein Marking and Smolt Monitoring

Salmonid Research, Monitoring, and Evaluation (RM&E)

Monitoring
Project ID24HR R-6
Recovery DomainsOzette Lake
Start Date04/01/2025
End Date09/30/2027
Year2024
StatusNew
Last Edited01/14/2025
 
1 - 1

Description    


We propose to operate the smolt trap during the sockeye smolt out-migration period from April 2025 to July 2025. Data analysis and reporting will be completed by October 2025. The calcein dye application for the next smolt cycle will begin in May/June 2026. These smolts will out-migrate in the Spring of 2027. We will provide progress reports per PCSRF and RCO reporting requirements, and provide a final report by the end of the contract period in 2027.

Project Benefit    


The ability to non-lethally monitor hatchery progeny in the out-migrating smolt population of this ESA listed stock is critical to implementing adaptive management of the sockeye recovery programs. This project has the potential to detect changes in freshwater survival of sockeye progeny four years sooner than adult returns alone without the confounding effects of variable marine survival. This in turn allows us to more rapidly adjust our rearing and release protocols as necessary.

Accomplishments

Metric Completed Originally
Proposed
Research and Monitoring
  Stream Miles Monitored 23.30

Funding Details

SourceFunds
PCSRF$56,810
Report Total:$56,810


Project Map



Worksites

55567434    


  • Worksite Identifier: 55567434
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Washington Coastal (171001)
  • Subbasin: Hoh-Quillayute (17100101)
  • Watershed: Ozette Lake-Frontal Pacific Ocean (1710010102)
  • Subwatershed: Ozette Lake (171001010204)
  • State: Washington
  • Recovery Domain: Ozette Lake
  • Latitude: 48.1251
  • Longitude: -124.6336

ESU

  • Ozette Lake Sockeye Salmon ESU

Map

Photos

Metrics

Metrics
  • E.0 Salmonid Research, Monitoring, and Evaluation (RM&E)Y (Y/N)
    •      . . E.0.a RM&E Funding .00
    •      . . E.0.b
      Complement habitat restoration project
    •      . . E.0.c
      Project identified in a plan or watershed assessment.
    •      . . E.0.d.1 Number of Cooperating Organizations
    •      . . E.0.d.2
      Name Of Cooperating Organizations.
    •      . . E.1 MonitoringY (Y/N)
      •      . . . . E.1.a Monitoring funding
      •      . . . . E.1.b.1 Stream Miles Monitored
      •      . . . . E.1.b.2 Acres of Watershed Area Monitored
      •      . . . . E.1.b.3 Square miles of water monitored (Square miles)
      •      . . . . E.1.c.2 Salmonid smolt or fry monitoringY (Y/N)
        •      . . . . . . E.1.c.2.a # miles (to nearest 0.01 mile) monitored for Salmonid smolt or fry
        •      . . . . E.1.d
          Name Of Comprehensive Monitoring Strategy/Program