WF Sproul Snip and Grip Wood Loading Project
Salmonid Habitat Restoration and Acquisition
|
| 1702410905285 | | - | | 04/23/2024 | | 01/31/2027 | | 2023 | | Ongoing | | 03/17/2026 | | |
| |
Description
This project is the construction of 36 large wood features containing a total of 160 pieces of LW. Most of the logs for the project will be sourced from the riparian zone, some may be purchased; all the logs will be redwood and Douglas fir. The project is along 1.7 miles of West Fork Sproul Creek, and once complete will restore approximately 5.7 acres of aquatic habitat. The completion of this project will result in the project reach consisting of 126 LW pieces per mile, which exceeds the SONCC target value of very good, and 1.62 key pieces per 100 meters, which exceeds the SONCC target value of good. This project will provide habitat to Coho, Chinook and steelhead. Additionally, this project will not impact any wetland habitat and 300 conifer seedlings and 100 native plants will be planted along the project reach. Project features are not located on wetlands, heavy equipment and vehicles will not drive over wetland areas.
Project Benefit
This project will benefit salmonids by increasing the availability of velocity refugia, increasing instream shelter, increasing off channel habitat availability, and by capturing and sorting spawning substrate.
Accomplishments
| Instream Habitat |
| Stream Miles Treated |
|
1.70 |
| Riparian Habitat |
| Stream Miles Treated |
|
1.50 |
| Acres Treated |
|
1.8 |
Funding Details |
| In-Kind Donated Labor | $56,331 |
| In-Kind Other | $70,000 |
| Report Total: | $126,331 |
|
| |
Worksites
1702410905690
- Worksite Identifier: 1702410905690
- Start Date:
- End Date:
Area Description
WF Sproul Creek Project Reach
Location Information
- Basin:
- Subbasin:
- Watershed:
- Subwatershed:
- State:
- Recovery Domain:
- Latitude: 40.03842
- Longitude: -123.87887
ESU
- Southern Oregon/Northern California Coast Coho Salmon ESU
- California Coastal Chinook Salmon ESU
- Northern California Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding .00
- . . C.0.b
Length of stream treated/protected
- . . C.0.c
| Project identified in a Plan or Watershed Assessment | |
|
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding
- . . . . C.4.b
Total length of instream habitat treated
- . . . . C.4.d.1
Channel structure placementY (Y/N)
- . . . . . . C.4.d.2
Material used for channel structure (LOV)
- . . . . . . C.4.d.3
Miles of stream treated through channel structure placement
- . . . . . . C.4.d.4
Acres of streambed treated through channel structure placement
- . . . . . . C.4.d.7
Number of structures placed in channel
- . . C.5
Riparian Habitat ProjectY (Y/N)
- . . . . C.5.a
Riparian Habitat Funding
- . . . . C.5.b.1
Total riparian miles streambank treated
- . . . . C.5.b.2
Total Riparian Acres Treated
- . . . . C.5.c.1
Riparian plantingY (Y/N)
- . . . . . . C.5.c.2
| Species of plants planted in riparian | |
|
- . . . . . . C.5.c.3
Acres planted in riparian
- . . . . . . C.5.c.4
Miles of streambank treated with riparian planting
|
|