Lindsay Creek (Kramer/Daley Property) Instream Salmonid Habitat Improvement Project
Salmonid Habitat Restoration and Acquisition
|
1671664683229 | N Central California Coast | 04/20/2023 | 03/31/2027 | 2022 | Ongoing | 05/01/2025 | |
| |
Description
This implementation project will construct CDFW-approved 100% engineered designs for improving in-stream and off-channel salmonid habitat along approximately 1,000 ft. of the Lindsay Creek mainstem channel. Specifically, this project will construct at least 8 instream LWD structures, create one off-channel alcove and 3 inset floodplains, and increase the overall frequency and duration of connectivity with the floodplain adjacent to the mainstem channel.
Project Benefit
Expected benefits include restoration of salmonid habitat by:
* Increasing pool habitat frequency, size, and distribution;
* Creating cover protection;
* Reducing in-channel stream velocities during high flow events;
* Providing temporal improvement of coho and other salmonid habitat by creating off-channel feature(s) to act as high flow refugia.
Accomplishments
Instream Habitat |
Stream Miles Treated |
|
.19 |
Funding Details |
PCSRF | $401,139 |
In-Kind Other | $29,250 |
Report Total: | $430,389 |
|
| |
Worksites
1671664683583
- Worksite Identifier: 1671664683583
- Start Date:
- End Date:
Area Description
Lindsay Creek Project Site
Location Information
- Basin: Northern California Coastal (180101)
- Subbasin:
- Watershed:
- Subwatershed:
- State: California
- Recovery Domain: N Central California Coast
- Latitude: 40.960488
- Longitude: -124.046962
ESU
- Southern Oregon/Northern California Coast Coho Salmon ESU
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding .00
- . . C.0.b
Length of stream treated/protected
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
|
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding
- . . . . C.4.b
Total length of instream habitat treated
- . . . . C.4.c.1
Channel reconfiguration and connectivityY (Y/N)
- . . . . . . C.4.c.2
Type of change to channel configuration and connectivity (LOV)
- . . . . . . C.4.c.3
Miles of stream treated for channel reconfiguration and connectivity
- . . . . . . C.4.c.4
Miles of off-channel stream created through channel reconfiguration and connectivity
- . . . . . . C.4.c.5
Acres of off-channel or floodplain connected through channel reconfiguration and connectivity
- . . . . . . C.4.c.6
Instream pools created/added through channel reconfiguration and connectivity
- . . . . C.4.d.1
Channel structure placementY (Y/N)
- . . . . . . C.4.d.2
Material used for channel structure (LOV)
- . . . . . . C.4.d.3
Miles of stream treated through channel structure placement
- . . . . . . C.4.d.4
Acres of streambed treated through channel structure placement
- . . . . . . C.4.d.5
Pools expected to be created through channel structure placement
- . . . . . . C.4.d.6
Yards of average stream-width at mid-point of channel structure placement project (Yards)
- . . . . . . C.4.d.7
Number of structures placed in channel
|
|