Ryan Creek Off-Channel Coho Habitat Implementation Project

Salmonid Habitat Restoration and Acquisition

Instream Habitat
Project ID1640903369059
Recovery Domains -
Start Date05/26/2022
End Date04/09/2026
Year2020
StatusCompleted
Last Edited08/28/2026
 
1 - 1

Description    


Project elements included construction of a 1.14 acre pond/alcove that overflows to a streamside alcove and into Ryan Creek. Construction included installing 18 large wood structures in the mainstem of Ryan Creek. The project started by conducting fish removal and relocation activities. This was followed by creating a clearwater diversion at the feeder stream culvert. Once the project area was dewatered, construction access was created and excavation of the pond was initiated. The only grading deviations from the plans were near the center of the ponded area

where they were slightly adjusted to protect a very large spruce tree. Spoils were endhauled to a low gradient hillside approximately 0.5 miles north of the project area. Once the grading was complete, large wood was added to the pond and alcove area, including several grade control structures that lay between the threshold of the pond and alcove. The last steps in the project included replanting.

Project Benefit    


Increase connectivity to off-channel aquatic habitat that is currently mostly disconnected. Increase the area available for rearing and benefit juvenile coho salmon by reducing competition pressures and increase access to food sources and new aquatic habitat. Project may serve as rearing habitat during out-migrant periods even when flood flows are not occurring. Woody debris structures will be constructed to increase habitat complexity and cover for juvenile coho salmon.

Accomplishments

Metric Completed Originally
Proposed
Instream Habitat
  Stream Miles Treated .27 .30

Funding Details

SourceFunds
PCSRF$695,620
In-Kind Other$77,000
Report Total:$772,620


Project Map



Worksites

1640903369344    


  • Worksite Identifier: 1640903369344
  • Start Date:
  • End Date:
Area Description
Ryan Creek Off-Channel Phase II

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 40.7555
  • Longitude: -124.13235

ESU

  • Southern Oregon/Northern California Coast Coho Salmon ESU

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 772,620.00
    •      . . C.0.b Length of stream treated/protected .27
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Recovery Plan for So. OR/No. CA Coast Coho Salmon (NOAA Final Sept 2014)
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 772,620.00
      •      . . . . C.4.b Total length of instream habitat treated .27
      •      . . . . C.4.c.1 Channel reconfiguration and connectivityY (Y/N)
        •      . . . . . . C.4.c.2 Type of change to channel configuration and connectivity (LOV)
        •      . . . . . . C.4.c.3 Miles of stream treated for channel reconfiguration and connectivity .27
        •      . . . . . . C.4.c.4 Miles of off-channel stream created through channel reconfiguration and connectivity .18
        •      . . . . . . C.4.c.5 Acres of off-channel or floodplain connected through channel reconfiguration and connectivity
        •      . . . . . . C.4.c.6 Instream pools created/added through channel reconfiguration and connectivity 10
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement .27
        •      . . . . . . C.4.d.5 Pools expected to be created through channel structure placement 10
        •      . . . . . . C.4.d.7 Number of structures placed in channel 18