Instream Flow Protection: Southeast – Phase 18_ROW

Salmonid Habitat Restoration and Acquisition

Instream Flow
Project IDAK54019_ROW
Recovery Domains -
Start Date07/01/2022
End Date06/30/2023
Year2020
StatusCompleted
Last Edited02/27/2024
 
1 - 1

Description    


The reservation of water application for Eva Creek Reach A was completed and submitted. More effort than expected was put toward the companion project (AK54019_GAGE) to collect additional flow measurements for future reservation applications; the balance of funds originally budgeted for this project were utilized there for setting up a new gage and taking measurements on 17 anadromous stream reaches.

Project Benefit    


The rivers of SE AK support some of North America’s most viable and productive salmon and steelhead fisheries. Salmon and steelhead depend on sufficient quantities of water to meet their spawning, rearing, incubation, overwintering, and migration habitat requirements. This project will benefit salmon and steelhead populations (including those used for important subsistence fisheries) throughout SE AK by legally reserving water needed to sustain their production.

Accomplishments

Metric Completed Originally
Proposed

Funding Details

SourceFunds
PCSRF$14,815
State$5,185
Report Total:$20,000


Project Map



Worksites

Eva Creek Reach A    


  • Worksite Identifier: Eva Creek Reach A
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Central Southeast Alaska (190102)
  • Subbasin: Baranof Island (19010212)
  • Watershed: Saook Bay-Frontal Peril Strait (1901021204)
  • Subwatershed: Lake Eva (190102120401)
  • State: Alaska
  • Recovery Domain:
  • Latitude: 57.40609
  • Longitude: -135.0809

ESU

  • Un-Named ESU Sockeye
  • Un-Named ESU Chum
  • Un-Named ESU Coho
  • Un-Named ESU Pink
  • Un-Named ESU Steelhead

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 20,000.00
    •      . . C.0.b Length of stream treated/protected 1.00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.3 Instream Flow ProjectY (Y/N)
      •      . . . . C.3.a Instream Flow Funding 20,000.00
      •      . . . . C.3.b Length of stream 'protected' for adequate flow 1.00
      •      . . . . C.3.c Change in water flow0 (cfs)
      •      . . . . C.3.g.1 Maintaining adequate flow or reducing withdrawalsY (Y/N)
        •      . . . . . . C.3.g.2 cfs (cubic feet per second) of water conserved per year137 (cfs)