FY 2021 NWIFC PCSRF db support

Salmonid Restoration Planning and Assessments

Restoration Planning And Coordination
Project ID21-NWIFC-02
Recovery DomainsPuget Sound
Start Date07/01/2024
End Date06/30/2025
Year2021
StatusNew
Last Edited04/15/2022
 
1 - 1

Description    


NWIFC’s Salmon Recovery Project Coordinator will provide PCSRF database support to ensure program reporting objectives are achieved. Specifically the Coordinator will confer with tribal grant recipients during the initial posting of PCSRF projects and duration of project, including providing advisement in the event of project modifications; and upon the completion of projects to ensure metric reporting objectives are met. NWIFC will also, with information at its disposal, populate data for projects since program inception. These funds will support approximately .2 FTE of the Coordinator’s salary, fringe, and indirect.

Project Benefit    


Project ensures that active projects adhere to the latest reporting standards required by NOAA Fisheries.

Accomplishments

Metric Completed Originally
Proposed

Funding Details

SourceFunds
PCSRF$74,140
Report Total:$74,140


Project Map



Worksites

51587825    


  • Worksite Identifier: 51587825
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Puget Sound
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Washington
  • Recovery Domain: Puget Sound
  • Latitude: 47.051694
  • Longitude: -122.792489

ESU

  • Puget Sound/Strait of Georgia Coho Salmon ESU
  • Olympic Peninsula Coho Salmon ESU
  • Hood Canal Summer-run Chum Salmon ESU
  • Puget Sound/Strait of Georgia Chum Salmon ESU
  • Olympic Peninsula Steelhead DPS
  • Puget Sound Steelhead DPS
  • Odd-year
  • Baker River Sockeye Salmon ESU
  • Quinault Lake Sockeye Salmon ESU
  • Lake Pleasant Sockeye Salmon ESU
  • Puget Sound Chinook Salmon ESU

Map

Photos

Metrics

Metrics
  • B.0 Salmonid Restoration Planning and AssessmentsY (Y/N)
    •      . . B.0.a Planning And Assessment Funding .00
    •      . . B.0.b.1 Area Encompassed
    •      . . B.1 Restoration Planning And CoordinationY (Y/N)
      •      . . . . B.1.a Planning and Coordination funding
      •      . . . . B.1.b.10 Designing or maintaining restoration data systemsY (Y/N)
        •      . . . . . . B.1.b.10.a
          Name of plan implemented
        •      . . . . . . B.1.b.10.b
          Description and scope of the plan implemented