Lower Jalama Creek Fish Passage Design

Salmonid Restoration Planning and Assessments

Restoration Planning And Coordination
Project ID1611968202684
Recovery DomainsS. California - S. Central CA Coast
Start Date05/05/2021
End Date01/31/2023
Year2019
StatusOngoing
Last Edited06/29/2022
 
1 - 1

Description    


The proposed project would evaluate the two existing impediments to fish passage; develop, evaluate, and rank three fish passage concept options for each barrier; select preferred alternatives; and prepare plans and specifications through 100% design for each barrier. All work would occur in collaboration with a stakeholder review team that includes, at a minimum, CDFW, NMFS, and Santa Barbara County. TNC will work with CDFW, the County and the Coastal Commission to secure necessary grading and Coastal Development permits. All other permits (e.g., 404, 401, 1600) will be obtained at the time of implementation. The grant includes biological and archaeological surveys necessary to complete CEQA at a future time. The project will result in a final design to remove or modify the two existing impediments to fish passage on Jalama Creek that will be ready for final permitting and construction.

Project Benefit    


Currently, the two passage barriers create conditions that impede, to varying degrees, the movement of juvenile and adult steelhead. A successful design that restores reliable connectivity between the ocean and upstream spawning and rearing habitat and that allows for unobstructed seasonal movements by juvenile steelhead could facilitate recovery of steelhead in this watershed.

Accomplishments

Metric Completed Originally
Proposed

Funding Details

SourceFunds
PCSRF$501,592
In-Kind Donated Labor$36,449
In-Kind Other$450
Report Total:$538,491


Project Map



Worksites

1611968202911    


  • Worksite Identifier: 1611968202911
  • Start Date:
  • End Date:
Area Description
Fish Passage Barrier JA-2 Bridge

Location Information

  • Basin: Central California Coastal
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: California
  • Recovery Domain: S. California - S. Central CA Coast
  • Latitude: 34.51375
  • Longitude: -120.48482

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • B.0 Salmonid Restoration Planning and AssessmentsY (Y/N)
    •      . . B.0.a Planning And Assessment Funding .00
    •      . . B.0.b.1 Area Encompassed
    •      . . B.1 Restoration Planning And CoordinationY (Y/N)
      •      . . . . B.1.a Planning and Coordination funding
      •      . . . . B.1.b.8 Conducting habitat restoration scoping and feasibility studiesY (Y/N)
        •      . . . . . . B.1.b.8.a
          Name of plan implemented
        •      . . . . . . B.1.b.8.b
          Description and scope of the plan implemented
      •      . . . . B.1.b.11 Engineering/design work for restoration projectsY (Y/N)
        •      . . . . . . B.1.b.11.a
          Name of plan implemented
        •      . . . . . . B.1.b.11.b
          Description and scope of the plan implemented

1611968202908    


  • Worksite Identifier: 1611968202908
  • Start Date:
  • End Date:
Area Description
Fish Passage Barrier JA-1 Dam

Location Information

  • Basin: Central California Coastal
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: California
  • Recovery Domain: S. California - S. Central CA Coast
  • Latitude: 34.51094
  • Longitude: -120.49341

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • B.0 Salmonid Restoration Planning and AssessmentsY (Y/N)
    •      . . B.0.a Planning And Assessment Funding .00
    •      . . B.0.b.1 Area Encompassed
    •      . . B.1 Restoration Planning And CoordinationY (Y/N)
      •      . . . . B.1.a Planning and Coordination funding
      •      . . . . B.1.b.8 Conducting habitat restoration scoping and feasibility studiesY (Y/N)
        •      . . . . . . B.1.b.8.a
          Name of plan implemented
        •      . . . . . . B.1.b.8.b
          Description and scope of the plan implemented
      •      . . . . B.1.b.11 Engineering/design work for restoration projectsY (Y/N)
        •      . . . . . . B.1.b.11.a
          Name of plan implemented
        •      . . . . . . B.1.b.11.b
          Description and scope of the plan implemented