Resurrection Creek Salmon Habitat Restoration

Salmonid Habitat Restoration and Acquisition

Instream Habitat Riparian Habitat
Project IDAK55005
Recovery Domains -
Start Date03/01/2022
End Date04/30/0024
Year2019
StatusCompleted
Last Edited05/09/2024
 
1 - 1

Description    


From May to early July 2023, .72 kilometers of Resurrection Creek were restored; work included construction of new stream channels, ponds, pools, and spawning beds and installation of root wads and logs to create natural riffles and resting areas for salmon spawning.

Project Benefit    


This project will: reestablish natural self-sustaining ecosystem functions on 1.3 km of Resurrection Creek, increase its climate resilience, and improve salmon habitat through floodplain connectivity, increased spawning habitat, and increased stream complexity (including log jams, pools, and restored sinuosity). Increased populations of salmon in Resurrection Creek will benefit the subsistence fishery at its mouth.

Accomplishments

Metric Completed Originally
Proposed
Instream Habitat
  Stream Miles Treated .72 .78
Riparian Habitat
  Stream Miles Treated .00 .78
  Acres Treated .0 22.0

Funding Details

SourceFunds
PCSRF$418,325
Other$155,725
Report Total:$574,050


Project Map



Worksites

Resurrection Creek    


  • Worksite Identifier: Resurrection Creek
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Kenai Peninsula (190203)
  • Subbasin: Upper Kenai Peninsula (19020302)
  • Watershed: Resurrection Creek (1902030205)
  • Subwatershed: Lower Resurrection Creek (190203020504)
  • State: Alaska
  • Recovery Domain:
  • Latitude: 60.879137
  • Longitude: -149.635819

ESU

  • Un-Named ESU Chinook
  • Un-Named ESU Chum
  • Un-Named ESU Coho
  • Un-Named ESU Pink
  • Un-Named ESU Sockeye

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 574,050.00
    •      . . C.0.b Length of stream treated/protected .72
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      U.S.D.A. Resurrection Creek Landscape Analysis (RCLA), 2002
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 574,050.00
      •      . . . . C.4.b Total length of instream habitat treated .72
      •      . . . . C.4.c.1 Channel reconfiguration and connectivityY (Y/N)
        •      . . . . . . C.4.c.2 Type of change to channel configuration and connectivity (LOV)
        •      . . . . . . C.4.c.3 Miles of stream treated for channel reconfiguration and connectivity .44
        •      . . . . . . C.4.c.4 Miles of off-channel stream created through channel reconfiguration and connectivity .24
        •      . . . . . . C.4.c.6 Instream pools created/added through channel reconfiguration and connectivity 0
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement .72
        •      . . . . . . C.4.d.4 Acres of streambed treated through channel structure placement .2
        •      . . . . . . C.4.d.5 Pools expected to be created through channel structure placement 6
        •      . . . . . . C.4.d.6 Yards of average stream-width at mid-point of channel structure placement project25.3 (Yards)
        •      . . . . . . C.4.d.7 Number of structures placed in channel 757
      •      . . . . C.4.f.1 Spawning gravel placementY (Y/N)
        •      . . . . . . C.4.f.2 Miles of stream treated with addition of spawning gravel .11
        •      . . . . . . C.4.f.3 Cubic yards of spawning gravel placed3282 (Cubic yards)
      •      . . C.5 Riparian Habitat ProjectY (Y/N)
        •      . . . . C.5.a Riparian Habitat Funding .00
        •      . . . . C.5.b.1 Total riparian miles streambank treated .00
        •      . . . . C.5.b.2 Total Riparian Acres Treated .0
        •      . . . . C.5.c.1 Riparian plantingY (Y/N)
          •      . . . . . . C.5.c.2
            Species of plants planted in riparian
            Riparian planting was delayed until 2024.
          •      . . . . . . C.5.c.3 Acres planted in riparian .0