Resurrection Creek Salmon Habitat Restoration
Salmonid Habitat Restoration and Acquisition
|
AK55005 | - | 03/01/2022 | 11/30/2024 | 2019 | Ongoing | 02/27/2024 | |
| |
Description
The hydraulic and heavy equipment placer mining on Resurrection Creek a century ago resulted in loss of soil and significantly altered the natural complexity of its stream channels. The National Forest Foundation (NFF), U.S. Forest Service (USFS) Chugach National Forest, and Trout Unlimited (TU), with support from Kinross Gold Corporation, will reconstruct the channel into a new (restored) meandering pool-riffle channel, recreate and reconnect the flood plain and off-channel habitat, install large woody debris, and revegetate the riparian area and flood plain.
Project Benefit
This project will: reestablish natural self-sustaining ecosystem functions on 1.3 km of Resurrection Creek, increase its climate resilience, and improve salmon habitat through floodplain connectivity, increased spawning habitat, and increased stream complexity (including log jams, pools, and restored sinuosity). Increased populations of salmon in Resurrection Creek will benefit the subsistence fishery at its mouth.
Accomplishments
Instream Habitat |
Stream Miles Treated |
|
.78 |
Riparian Habitat |
Stream Miles Treated |
|
.78 |
Acres Treated |
|
22.0 |
Funding Details |
PCSRF | $418,325 |
Other | $159,171 |
Report Total: | $577,496 |
|
| |
Worksites
Resurrection Creek
- Worksite Identifier: Resurrection Creek
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Kenai Peninsula (190203)
- Subbasin: Upper Kenai Peninsula (19020302)
- Watershed: Resurrection Creek (1902030205)
- Subwatershed: Lower Resurrection Creek (190203020504)
- State: Alaska
- Recovery Domain:
- Latitude: 60.879137
- Longitude: -149.635819
ESU
- Un-Named ESU Sockeye
- Un-Named ESU Chinook
- Un-Named ESU Chum
- Un-Named ESU Coho
- Un-Named ESU Pink
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding .00
- . . C.0.b
Length of stream treated/protected
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
|
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding
- . . . . C.4.b
Total length of instream habitat treated
- . . . . C.4.c.1
Channel reconfiguration and connectivityY (Y/N)
- . . . . . . C.4.c.2
Type of change to channel configuration and connectivity (LOV)
- . . . . C.4.d.1
Channel structure placementY (Y/N)
- . . . . . . C.4.d.2
Material used for channel structure (LOV)
- . . C.5
Riparian Habitat ProjectY (Y/N)
- . . . . C.5.a
Riparian Habitat Funding
- . . . . C.5.b.1
Total riparian miles streambank treated
- . . . . C.5.b.2
Total Riparian Acres Treated
- . . . . C.5.c.1
Riparian plantingY (Y/N)
- . . . . . . C.5.c.2
Species of plants planted in riparian | |
|
|
|