Little Springs Migration Barrier Removal
Salmonid Habitat Restoration and Acquisition
|
725552 | N CA - S Oregon | 07/01/2018 | 03/08/2021 | 2016 | Completed | 01/25/2024 | |
| |
Description
Restore fish passage with the installation of a natural bottom multi-plate crossing structure and grade controls sufficient to maintain existing stream profile. This was accomplished by removing the under sized metal culvert pipe and fill material.
Project Benefit
Increase fish passage by removing a culvert will improve juvenile coho migration.
Accomplishments
Fish Passage |
Barriers Removed |
|
|
Miles Opened |
1.20 |
1.20 |
Funding Details |
PCSRF | $72,484 |
In-Kind Other | $16,394 |
Report Total: | $88,878 |
|
| |
Worksites
7211195
- Worksite Identifier: 7211195
- Start Date:
- End Date:
Area Description
Little Springs Creek at East Louie Road
Location Information
- Basin: Klamath (180102)
- Subbasin: Shasta (18010207)
- Watershed: Parks Creek-Shasta River (1801020704)
- Subwatershed:
- State: California
- Recovery Domain: N CA - S Oregon
- Latitude: 41.593355
- Longitude: -122.431533
ESU
- Upper Klamath / Trinity Rivers Chinook Salmon ESU
- Southern Oregon/Northern California Coast Coho Salmon ESU
- Klamath Mountains Province Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 72,484.00
- . . C.0.b
Length of stream treated/protected .01
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
CDFW- Recovery Strategy for California Coho Salmon |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.2
Fish Passage ImprovementY (Y/N)
- . . . . C.2.a
Fish Passage Funding 72,483.86
- . . . . C.2.b.1
Length of stream made accessible 1.20
- . . . . C.2.b.2
Square miles of streambed made accessible.1 (Square miles)
- . . . . C.2.b.3
Type of blockage/barrier (LOV)
- . . . . C.2.b.4
Number of blockages/impediments/barriers impeding passage 1
- . . . . C.2.g.1
Bridge installed or improved at road stream crossingY (Y/N)
- . . . . . . C.2.g.2
Number of bridges installed or improved/upgraded 1
- . . . . . . C.2.g.3
Miles of stream made accessible by bridge installation or improvement/upgrade 1.20
|
|