Jordan Creek Instream Habitat Enhancement Project
Salmonid Habitat Restoration and Acquisition
|
725544 | N Central California Coast | 06/01/2018 | 05/13/2020 | 2017 | Completed | 01/25/2024 | |
| |
Description
Fifteen instream structures were installed along 0.4 miles of Jordan creek. A total of 59 pieces of LWD were added to the stream channel during the course of this project. The LWD in the structures was configured to improve the quality and quantity of spawning and rearing habitat for salmonids by increasing habitat diversity and availability, improving pool depth and frequency, and by sorting
spawning gravels. PCSRF FY2014 funds were spent within the allowable award period even though the project ended outside the award scope.
Project Benefit
Expected benefits is to supplement on-going efforts to provide short-term and long-term benefits to Coho Salmon by restoring LWD and shade through LWD placement and improvement of existing riparian zones through plantings.
Accomplishments
Instream Habitat |
Stream Miles Treated |
.47 |
.40 |
Riparian Habitat |
Stream Miles Treated |
.40 |
.40 |
Acres Treated |
2.0 |
.7 |
Funding Details |
PCSRF | $96,117 |
In-Kind Donated Labor | $16,493 |
In-Kind Other | $13,200 |
Report Total: | $125,810 |
|
| |
Worksites
7211164
- Worksite Identifier: 7211164
- Start Date:
- End Date:
Area Description
Jordan Creek
Location Information
- Basin: Northern California Coastal (180101)
- Subbasin: Lower Eel (18010105)
- Watershed: Price Creek-Eel River (1801010510)
- Subwatershed: Bear Creek-Eel River (180101051001)
- State: California
- Recovery Domain: N Central California Coast
- Latitude: 40.43543
- Longitude: -124.04052
ESU
- California Coastal Chinook Salmon ESU
- Southern Oregon/Northern California Coast Coho Salmon ESU
- Northern California Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 133,520.00
- . . C.0.b
Length of stream treated/protected .47
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
NOAA. 2012. Southern Oregon/ Northern California Coastal Coho Salmon Recovery Plan, NOAA, Washington, D.C |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 132,820.00
- . . . . C.4.b
Total length of instream habitat treated .47
- . . . . C.4.d.1
Channel structure placementY (Y/N)
- . . . . . . C.4.d.2
Material used for channel structure (LOV)
- . . . . . . C.4.d.3
Miles of stream treated through channel structure placement .40
- . . . . . . C.4.d.5
Pools expected to be created through channel structure placement 0
- . . . . . . C.4.d.7
Number of structures placed in channel 15
- . . C.5
Riparian Habitat ProjectY (Y/N)
- . . . . C.5.a
Riparian Habitat Funding 700.00
- . . . . C.5.b.1
Total riparian miles streambank treated .40
- . . . . C.5.b.2
Total Riparian Acres Treated 2.0
- . . . . C.5.c.1
Riparian plantingY (Y/N)
- . . . . . . C.5.c.2
Species of plants planted in riparian | |
Sequoioideae, Pseudotsuga, Salix |
- . . . . . . C.5.c.3
Acres planted in riparian 2.0
|
|