Fish Passage and Off-Channel Habitat Restoration at Roy's Pools

Salmonid Habitat Restoration and Acquisition

Fish Passage Improvement Instream Habitat
Project ID725512
Recovery DomainsN Central California Coast
Start Date07/01/2018
End Date03/31/2022
Year2017
StatusOngoing
Last Edited04/13/2022
 
1 - 1

Description    


The project will implement a design funded by a previous FRGP project to completely remove a concrete and metal dam and fish ladder. Doing so will make available 3.5 miles of upstream habitat while creating 250 feet of side channel habitat for winter rearing habitat-a major limiting factor for coho survival in the watershed. It will eliminate annual fish stranding and mortality, and allow for year-round upstream and downstream migration for all life stages of endangered coho and steelhead.

Project Benefit    


Removal of the dam will provide access to 3.5 miles of upstream habitat.

Accomplishments

Metric Completed Originally
Proposed
Instream Habitat
  Stream Miles Treated .20
Fish Passage
  Barriers Removed 1
  Miles Opened 3.50

Funding Details

SourceFunds
PCSRF$2,141,484
Report Total:$2,141,484


Project Map



Worksites

7211114    


  • Worksite Identifier: 7211114
  • Start Date:
  • End Date:
Area Description
Roy's Pools

Location Information

  • Basin: San Francisco Bay
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: California
  • Recovery Domain: N Central California Coast
  • Latitude: 38.01253
  • Longitude: -122.662822

ESU

  • Central California Coast Coho Salmon ESU
  • Central California Coast Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding .00
    •      . . C.0.b Length of stream treated/protected
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.2 Fish Passage ImprovementY (Y/N)
      •      . . . . C.2.a Fish Passage Funding
      •      . . . . C.2.b.1 Length of stream made accessible
      •      . . . . C.2.b.3 Type of blockage/barrier (LOV)
      •      . . . . C.2.b.4 Number of blockages/impediments/barriers impeding passage
      •      . . . . C.2.c.1 Fish passage blockages removed or altered (other than road crossings reported in C.2.f to C.2.i)Y (Y/N)
        •      . . . . . . C.2.c.2 Number of blockages/impediments/barriers removed/altered
      •      . . . . C.2.d.1 Fishway chutes or pools installedY (Y/N)
        •      . . . . . . C.2.d.2 Number of fishway chutes/pools installed
      •      . . . . C.2.g.1 Bridge installed or improved at road stream crossingY (Y/N)
        •      . . . . . . C.2.g.2 Number of bridges installed or improved/upgraded
        •      . . . . . . C.2.g.3 Miles of stream made accessible by bridge installation or improvement/upgrade
      •      . . C.4 Instream Habitat ProjectY (Y/N)
        •      . . . . C.4.a Instream Habitat Funding
        •      . . . . C.4.b Total length of instream habitat treated
        •      . . . . C.4.c.1 Channel reconfiguration and connectivityY (Y/N)
          •      . . . . . . C.4.c.2 Type of change to channel configuration and connectivity (LOV)
          •      . . . . . . C.4.c.3 Miles of stream treated for channel reconfiguration and connectivity
          •      . . . . . . C.4.c.6 Instream pools created/added through channel reconfiguration and connectivity
        •      . . . . C.4.d.1 Channel structure placementY (Y/N)
          •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
          •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement
          •      . . . . . . C.4.d.5 Pools expected to be created through channel structure placement
          •      . . . . . . C.4.d.6 Yards of average stream-width at mid-point of channel structure placement project (Yards)