Mattole Storage and Forbearance 2017-2020

Salmonid Habitat Restoration and Acquisition

Instream Flow
Project ID725246
Recovery DomainsN Central California Coast
Start Date06/26/2017
End Date04/11/2021
Year2016
StatusCompleted
Last Edited01/25/2024
 
1 - 1

Description    


The project included:

1) Installation of 50,000 gallons of domestic water storage

2) Forbearance Agreement with participating landowner that restricts water diversions in the driest months

3) Protect anadromous species from injury by properly screening diversion associated with the

project.

The project installed storage tanks on one property referred to as the ?Richter? property. A Forbearance Agreement was implemented on this property which had existing diversions operating under legal water rights but with no seasonal restrictions or bypass flow requirements. The project imposes a ?no-pump? season, along with seasonal pumping restrictions in spring and fall?including bypass flow requirements and assigned pumping days. Additionally the project upgraded the existing submersible pumps with fish screens

that comply with CDFW criteria.

Project Benefit    


Increased summer stream flows will improve water quantity/quantity and increase cover for Coho.

Accomplishments

Metric Completed Originally
Proposed

Funding Details

SourceFunds
PCSRF$83,748
State$3,412
In-Kind Volunteers$2,400
In-Kind Other$41,565
Report Total:$131,125


Project Map



Worksites

7211378    


  • Worksite Identifier: 7211378
  • Start Date:
  • End Date:
Area Description
Kornberg

Location Information

  • Basin: Northern California Coastal (180101)
  • Subbasin: Mattole (18010107)
  • Watershed: Mattole River (1801010702)
  • Subwatershed:
  • State: California
  • Recovery Domain: N Central California Coast
  • Latitude: 40.0539
  • Longitude: -123.9614

ESU

  • California Coastal Chinook Salmon ESU
  • Southern Oregon/Northern California Coast Coho Salmon ESU
  • Northern California Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 138,225.00
    •      . . C.0.b Length of stream treated/protected 1.60
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Mattole River and Range Partnership (MRRP), 2009, Mattole Integrated Coastal Management Plan: Foresight 2020, Mattole Restoration Council, Petrolia, CA
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.3 Instream Flow ProjectY (Y/N)
      •      . . . . C.3.a Instream Flow Funding 138,225.00
      •      . . . . C.3.b Length of stream 'protected' for adequate flow 1.60
      •      . . . . C.3.c Change in water flow.02 (cfs)
      •      . . . . C.3.g.1 Maintaining adequate flow or reducing withdrawalsY (Y/N)
        •      . . . . . . C.3.g.2 cfs (cubic feet per second) of water conserved per year.02 (cfs)